Startup buildout

Mecca Dental

A complete buildout, from the first conduit to go-live support on opening day.

Location

Dallas, TX

Practice type

General dentistry, five operatories

Scope

Full technology buildout

Year

2022

The build

Mecca came to us at the lease stage, which is the right time. We reviewed the floor plan, moved the server location away from a wall that would have made cooling impossible, and set the drop schedule before construction started.

During rough-in we pulled and labelled every run, then came back at fit-out for terminations, racks and equipment. Wire management was done properly because the owner was going to see the rack every day.

Two engineers were onsite for opening day. Nothing dramatic happened, which was the objective.

All work
Mecca Dental interior
Mecca Dental build detail 1
Mecca Dental build detail 2
Mecca Dental build detail 3

Start with the assessment.

Thirty minutes on your network, your backups and your HIPAA exposure. You keep the findings whether or not you work with us.