Phoenix Dental Office Heat and Monsoon IT Plan: Server Closets, Dust Storms and SRP or APS Outages
It is a late-August afternoon at a practice in Chandler. The hygienist's phone shows a dust wall on the radar, the lights in the operatories flicker twice, and the closet behind the sterilization room, where the server and the firewall live, is already warm to the touch.
That plan is what this article builds, step by step. Who should run that plan is a separate question, and Legend Networking answers it for the metro on its page about dental IT support in Phoenix; this article is the hands-on side, written for the office manager or owner who will be standing in that warm closet. It assumes a practice of the usual Valley size: a handful of operatories, a front desk, one server or none, a firewall, a switch, a UPS or two, and an internet line that every part of the day depends on.
The metro-wide view (growth, the Valley's two dental schools, Arizona time and how support reaches an office) lives in the guide to dental IT for Phoenix practices. Here we stay with weather. We cover why the heat matters, what a monsoon storm or haboob does to an office's systems, why SRP or APS matters, where a planned shutoff could reach, the order for powering down and back up, how to keep the schedule reachable when the internet drops, who owns each step, and what to finish before next June. Nothing here is a runtime promise or a temperature rule invented for the page; where a number appears, its source is named.
A Phoenix dental office needs one IT plan for two seasons. For the heat, measure the equipment closet in July, keep UPS batteries young and keep dust out. For the monsoon, know whether you are on SRP or APS, power down in a set order before the outage does it for you, and restart in reverse.
- In 2024 Phoenix reached 110°F or higher on 70 days and stayed in triple digits for a record 113 straight days; closet heat ages dental IT equipment over months, not in one afternoon.
- APC's battery guidance says every 8°C (15°F) rise in temperature cuts a UPS battery's life in half, so batteries in a warm Valley closet need checking every spring.
- The August 25, 2025 storm cut power to up to 54,000 SRP and 12,000 APS customers, from Chandler–Gilbert to Buckeye; know which utility serves each address.
- APS's planned shutoff program names parts of Pinal and four other counties, not Maricopa; Pinal offices plan for it, central Phoenix offices plan for storms.
- Power down from the edges in, restart in reverse, and check the backup before the first patient; write the order down and name who starts it.
In this guide
- Why does Phoenix heat put a dental office's computers at risk?
- What happens to a dental office's IT during a monsoon storm or haboob in the Valley?
- Is your office on SRP or APS, and why does it matter?
- What should a dental office plan if an APS Public Safety Power Shutoff could reach it?
- How should the office power down ahead of a dust storm and bring systems back afterward?
- What keeps the practice reachable and the data safe when the internet drops?
- What should a Phoenix dental office heat and monsoon IT plan include, and who owns each step?
- What should you do before next summer?
- What to ask your IT provider about heat and monsoon season
- Key takeaways
- Sources
- Frequently asked questions
- The bottom line
Why does Phoenix heat put a dental office's computers at risk?
Phoenix heat matters because it is long, not just high. In 2024 the thermometer hit 110°F or more on 70 days, where 21 is normal, and stayed at 100°F or more for 113 straight days. A small closet with a server, a switch and a UPS heats up quietly over those months, and the damage shows up as early failures.
Those 2024 figures come from the National Weather Service, as reported by KJZZ at the start of 2025: the 113-day run beat the previous record of 76 days, and the year's average temperature of 78.6°F made 2024 the hottest year on record. The point for a dental office is not one record afternoon. It is that cooling gets tested every day for months, including nights and weekends, when nobody is in the building to notice.
Three things in a typical Valley office make it worse:
- The closet was never meant for equipment. Network gear often ends up in a janitor's closet, a utility room beside the water heater, a cabinet under the front desk or a corner of the sterilization room. These spaces usually have no supply vent and no return, so heat from the equipment has nowhere to go.
- The sun hits one wall all afternoon. A west-facing room or a closet on an exterior wall can run much warmer at 4 p.m. than the same room at 9 a.m. The reading that matters is the late-afternoon one.
- The thermostat is set for people. Many suites raise the setpoint or switch the system off after hours to save on summer power bills. People go home; the server, the firewall and the backup device keep working in a room that is now warming by the hour.
Heat rarely kills equipment in one dramatic moment. It shortens its working life. Fans run harder and clog faster, drives and power supplies age early, and UPS batteries lose capacity well before their expected replacement date (more on that below). The spec sheet for each device states the temperature range it is built to run in. That operating range, measured against what your closet actually reaches, is the only threshold that matters here; we do not give a generic number, because the right one depends on the equipment you own.
Read your closet in July: a ten-minute routine
This is the routine we suggest an office manager or the IT provider run every summer. It costs a few minutes and a small digital thermometer or temperature logger that records over several days.
| When | What to read or check | Why it matters | What to write down |
|---|---|---|---|
| A weekday in July, about 3 p.m. | Temperature inside the closet or cabinet, at the height of the equipment, door closed as usual | The hottest normal working hour on a sun-facing wall | Date, time, reading, outdoor high that day |
| A Saturday or Sunday in July | The logger's record from the weekend, with the thermostat on its after-hours setting | Shows what the equipment lives through when the office is empty | Highest reading and when it happened |
| Same visit | Each device's operating range from its spec sheet (server, firewall, switch, UPS, backup device) | The only threshold that applies to your hardware | Device, model, stated range, gap to your reading |
| Monthly, May to September | UPS self-test result and the battery install date on its label | Heat ages batteries; a failed self-test is a warning you can act on | Pass or fail, battery age |
| After every dust storm | Dust on intake grilles, fans and any filter on the closet's door or vent | Haboob dust gets into rooms with poor seals and chokes cooling | Cleaned or not, by whom |
| Once a season | What is plugged into each UPS, socket by socket | Space heaters, printers and coffee makers do not belong on a battery | Label each plug; remove anything that is not IT |
| Once a season | A photo of the closet, door open | Shows cable mess, blocked vents and stored boxes the provider cannot see remotely | Photo filed with the readings |
Keep the readings in one place, a shared spreadsheet or the IT provider's ticket, so next summer's numbers can be compared with this year's. A closet that read close to the top of a device's range in July is a closet to fix in the spring, by adding a vent, an exhaust fan or a dedicated cooling unit, moving the equipment, or retiring the on-site server altogether.
What happens to a dental office's IT during a monsoon storm or haboob in the Valley?
A monsoon storm hits the IT in three ways at once: power drops or flickers as poles and lines are damaged, dust pushes into rooms and equipment, and internet service can fail separately from the power. In the storm of August 25, 2025, as many as 54,000 SRP and 12,000 APS customers lost power across the metro.
The summer monsoon brings dust storms (the haboobs that roll in as a brown wall), severe thunderstorms, lightning, strong winds and damaged poles. On that August evening, the National Weather Service in Phoenix issued dust storm and severe thunderstorm warnings for Maricopa and Pinal counties. According to azfamily.com's report the next day, SRP's worst-hit areas were around Chandler and Gilbert, along the line between Glendale, AZ and Peoria, around Tolleson, and in the South Mountain part of Phoenix. For APS, the biggest outages were in Buckeye and in central Phoenix. When Tuesday morning came, roughly 100 SRP customers and 50 APS customers were still waiting for power.
Two lessons sit in those numbers. First, most of the outage was over by morning, which means the costly part for a dental office is often not a long blackout but a hard, uncontrolled power cut in the evening, followed by a morning when nobody is sure whether the server came back cleanly. Second, the hotspots spread across the East Valley and the West Valley at once; an office in Glendale, AZ and one in Gilbert can be dealing with the same storm on the same evening. The plan applies to every office between those points too. If your practice sits in the middle of that map, Legend's page on dental IT support in Mesa and Tempe lists the parts of the Valley it covers.
What actually fails, in order of how often offices tend to see it:
- Brief flickers and brownouts. Unprotected workstations reboot mid-chart. Imaging PCs drop the sensor connection. A device on a weak UPS restarts anyway.
- A full outage after the office has closed. The UPS carries the server for a while, then the battery runs down and the server loses power without a clean shutdown, which is how databases and backup jobs get damaged.
- Dust. After a haboob, intake grilles and fans in the closet, under the front desk and in operatory towers carry a new layer of fine dust that cuts airflow for the rest of the summer.
- An internet cut that outlasts the power cut. Carrier equipment in the neighborhood has its own power and its own repair queue. Your lights can come back while the line stays down.
- Surges when power returns. Equipment that was not shut down, and is not on a surge-protected or battery-backed outlet, takes the spike when service is restored.
Table 1: Two seasons, one plan
This is the table to print and pin inside the closet door. It lists each kind of Valley weather event, what tends to fail in a dental office, the first action, who acts and what to have ready beforehand.
| Event | What fails in a dental office | First action | Who acts | What to have ready |
|---|---|---|---|---|
| Extreme heat days (stretches at or above 110°F) | Closet gear running warm, UPS batteries aging early, fans clogging, workstations under the front desk overheating | Check the closet reading in the afternoon; open the closet or run its exhaust fan if the reading is near the top of a device's range | Practice (reading); IT provider (comparison with spec sheets, fix) | Thermometer or logger, spec-sheet ranges, the after-hours thermostat setting written down |
| Monsoon thunderstorm with lightning and pole damage | Flickers, brownouts, hard power cuts, surge damage to unprotected devices | Save and close open charts and images; follow the shutdown order if the warning covers your area and the lights have already flickered | Practice (front desk lead); IT provider (remote checks) | The written shutdown order, UPS on server and network gear, surge protection on every other IT device |
| Dust storm (haboob) | Dust in fans and intakes; power cuts from wind damage | Close the closet door and any vent that opens to the outside; follow the shutdown order if power starts to fail | Practice | A named person per shift who owns the closet; clean filters on hand |
| Utility outage after a storm | Server on battery, then off; backup job interrupted; phones that depend on power and internet go quiet | Check the SRP or APS outage map for your address; report the outage; record the time power went off | Practice (report); utility (repair); IT provider (clean restart, backup check) | The outage map bookmarked, your utility account number, the restart order |
| APS Public Safety Power Shutoff (Pinal County and outlying communities APS names only) | A planned outage with notice, possibly for a day or more of clinic time | Read the APS notice; decide in advance whether to close, reschedule or move work | Practice (schedule); utility (notice and restoration); IT provider | Contact details current with APS; the shutdown order; a plan for patient calls |
| Internet cut on the carrier side | Cloud software, e-claims, internet phones, card terminals and imaging sync stop; power may be fine | Confirm the firewall moved traffic to the second path; check your carrier's business outage page | Carrier (repair); IT provider (failover, tickets); practice (front-desk workaround) | A second internet path that does not share the first one's cable or pole, the carrier's account and circuit numbers |
Is your office on SRP or APS, and why does it matter?
Most Valley offices get power from SRP or APS, depending on the address, and each utility keeps its own outage map, alert sign-up and reporting route. Knowing which one serves your suite before a storm saves the office manager from searching both maps in the dark while the UPS beeps.
The utility boundary does not follow city names in a way you can guess from a map, so do not guess. The quickest check is the electric bill for the suite: the utility's name is on it, along with the account number you will need to report an outage. If your landlord pays power as part of a common-area charge, ask the property manager which utility serves the building and whether the account is in the landlord's name, because that changes who can report an outage and who receives alerts.
Once you know the utility:
- Bookmark its outage map on the front-desk computer and on the phones of whoever opens and closes the office.
- Sign up for outage alerts on the account that covers the practice, and make sure they go to someone who will act on them after hours, not to an inbox nobody reads.
- Write the account number inside the closet door, next to the restart order, so whoever reports the outage has it.
- Tell your IT provider which utility serves each location. If you have two offices, one in the East Valley and one in the West Valley, they may be on different utilities and get very different nights during the same storm.
> Outage and alert bookmarks for a Valley dental office > > - SRP outages and storm safety (outage map): srpnet.com/customer-service/safety/outages-storm > - APS Outage Center (outage map and reporting): aps.com/outages > - APS Public Safety Power Shutoff (Pinal and outlying offices): aps.com/psps > - National Weather Service Phoenix (alerts and warnings): weather.gov/psr > - NWS Phoenix monsoon safety: weather.gov/psr/MonsoonSafety > - Your internet carrier's business outage or status page: ask the carrier for its address and add it here. > > Phone numbers change; take them from your own bill or the utility's website rather than from any article, including this one.
What should a dental office plan if an APS Public Safety Power Shutoff could reach it?
Only offices in the higher fire-risk areas APS names need this section. APS says a Public Safety Power Shutoff could affect parts of Coconino, Gila, Navajo, Pinal and Yavapai counties; Maricopa County is not on that list. For a Pinal practice, such as one around San Tan Valley, treat a shutoff as a scheduled closure with notice.
APS says it contacts affected customers by email, text or phone, and that if lines are undamaged, power is restored during daylight hours after inspection. So: keep the APS account's contact details current, run the full shutdown order the evening before instead of relying on the UPS, and plan the restart before patients arrive. Offices in central Phoenix, Scottsdale and the rest of Maricopa County plan for storm outages instead.
How should the office power down ahead of a dust storm and bring systems back afterward?
Power down from the edges in: save and close the practice software, shut down the imaging PCs, then the other workstations, then the server last, and leave the firewall, switch and internet equipment on the UPS. Bring things back in reverse once the power has been steady for a while, and check the backup before the first patient.
The trigger should be written down in advance, not decided by whoever is nearest the closet. A reasonable rule for many offices is: start the order when a warning covers your part of the Valley and the lights have already flickered, or when the power is out and the utility map does not show a quick return. Agree the exact rule with your IT provider, because it depends on how your server is set up and what your UPS can carry. We do not give battery runtimes here; how long your UPS lasts depends on its size, its battery age and what is plugged into it, and the provider should test and record that for your equipment.
The Valley shutdown order
- Front desk and operatories save and close. Finish the note, post the payment, close the practice management software (Dentrix, Eaglesoft, Open Dental or whatever the office runs) on every workstation. An open chart is the one most likely to be damaged by a hard cut.
- Imaging comes down next. Let any capture in progress finish, close the imaging software, then shut down the imaging PCs. Leave sensors plugged in; they do not need to be unplugged unless the imaging vendor's instructions say so.
- Other workstations shut down. Use the normal shutdown, not the power button. Check the PC under the front desk; it is often forgotten.
- The server shuts down last. It should shut down cleanly, by the IT provider remotely or by a named person following the provider's written steps. If your UPS is set to shut the server down automatically when the battery runs low, confirm with the provider that the setting has been tested this year.
- Network gear stays on battery. The firewall, switch and modem stay on the UPS as long as it lasts, so the provider can still see the office and alerts can reach whoever is on call.
- Unplug what does not need to be on. NWS Phoenix advises unplugging appliances not needed during lightning; for the office, that means printers, spare monitors and anything on a plain power strip rather than a surge protector or UPS.
The morning-after restart order
- Wait until power is steady. Check the SRP or APS map for your address and give the building a few minutes after the lights return; air conditioning and elevators restarting can cause more flickers.
- Check the closet first. Look for dust, burnt smell, alarms on the UPS or a closet that heated up while the air conditioning was off. Let a hot closet cool before turning equipment on.
- Network gear, then server. Confirm the firewall and switch are up and the internet is working, then start the server and let it finish starting before anyone logs in.
- Workstations, then imaging. Start the front desk and one operatory, open the practice software and a chart, then bring up imaging PCs and take a test capture from each sensor.
- Check the backup. Ask the provider to confirm that the overnight backup either ran or has been rerun, and that the server's data passed its checks.
- Phones and card terminals last. Place a test call in and out and run a test card transaction before the first patient.
For the full method, including UPS settings and the mistakes that damage servers, see server shutdown mistakes to avoid.
What keeps the practice reachable and the data safe when the internet drops?
Two things: a second internet connection that does not share the first one's cable, pole or carrier, set up so the firewall switches over without anyone touching it, and an offsite backup of the practice's data that has been restored from recently. Together they keep the schedule, the phones and the patient records available while the storm repair crews work.
Business internet in the metro is sold over several kinds of line: cable (Cox Business is the familiar name), fiber and older copper-based service from Lumen under its CenturyLink and Quantum Fiber brands, and AT&T Fiber, among others. Which ones reach a given suite varies building by building. A second connection only helps if it fails differently from the first, so the useful question for each carrier is how its line physically gets into the building. Two services that come in on the same pole or in the same conduit can go down together in the same storm. A cellular or fixed-wireless backup is another option where a second wired carrier is not available, as long as it is tested before summer.
Make a short written list of what stops when the line goes down: cloud practice software, e-claims and eligibility checks, internet phones, card terminals, email, imaging that syncs to the cloud, and remote access for your IT provider. That list tells you which of them the second connection must carry and which can wait. Reading this with the line already dead? Go to what to do when the dental office internet is down first. For designing the second path and the failover itself, Legend's page on dental network design covers how that work is scoped.
Then the data. An outage that damages the server is an inconvenience if a clean copy of the practice database and images exists somewhere else, and a crisis if it does not. Offsite backup means a copy outside the building, checked by a test restore, not only a backup drive sitting in the same warm closet as the server. How Legend runs offsite copies is on its backup and recovery service for dental offices page; to audit your own setup line by line, use the dental backup and disaster recovery checklist.
Does moving to the cloud solve the heat problem?
It moves part of it. Cloud practice software takes the server, and its heat, out of your closet, but the office still needs a firewall, a switch, workstations, imaging PCs and, more than ever, a reliable internet connection, all of which still sit in the same building through the same summers. If your server is due for replacement, weigh the move on the whole picture, not the heat alone; dental server replacement vs cloud migration sets out the trade-offs.
What should a Phoenix dental office heat and monsoon IT plan include, and who owns each step?
A workable plan fits on two pages: closet readings against spec-sheet ranges, the UPS list, the shutdown trigger and order, the restart order, the backup check, the second internet path and the bookmarks. Each line needs an owner (practice, IT provider, utility or carrier), or it will not run at 6 p.m. on a storm evening.
Here is how the work usually splits. Agree it in writing with your provider, whoever that is; Legend Networking's own approach is on its page about dental IT services in Phoenix.
| Step | Practice | IT provider | Utility (SRP or APS) | Carrier |
|---|---|---|---|---|
| Closet readings in July | Takes the reading or places the logger | Compares with spec sheets, recommends the fix | — | — |
| UPS batteries and self-tests | Notes alarms and beeps, reports them | Tracks battery age, tests, schedules replacement | — | — |
| Shutdown trigger and order | Names a lead per shift, starts the order | Writes the order, shuts the server down remotely where possible | — | — |
| Reporting an outage | Reports from the bill's account | — | Repairs, posts updates on its map | — |
| Restart and checks | Opens the office, checks the closet | Restarts in order, confirms services and backup | — | — |
| Second internet path | Approves the order and cost | Designs failover, tests it before summer | — | Installs, repairs its own line |
| Offsite backup | Approves retention and budget | Runs it, tests restores, reports results | — | — |
| Annual review | Owner signs off on changes | Brings readings, battery ages and failures to the review | — | — |
On timing: from the second Sunday in March to the first Sunday in November, Phoenix is two hours behind Dallas (one hour the rest of the year), because Arizona stays on Mountain Standard Time all year and Texas moves its clocks. For a practice working with Legend Networking, headquartered in Dallas, Texas, that difference does not set the support window. Legend's helpdesk is staffed 24/7 at 1-800-794-1588, and Legend provides 24/7 monitoring, so a 7 p.m. dust storm in Gilbert or a restart question at 6 a.m. in Peoria has somewhere to go. Legend's model is "Onsite dispatch by appointment across served dental markets; remote-first nationwide", with in-house engineers; no outsourced first-level triage. Day-to-day software and support issues are handled remotely; cabling, installations, equipment moves and new-office build-outs are scheduled onsite by appointment. Backup protection from $39.99 per month (storage-dependent) is one line Legend publishes; hardware procurement, major cabling projects and software licensing are quoted separately.
Legend Networking has 22+ years in dental IT (since 2004) and has served over 3,500 practices since 2004, with a 4.8 rating · 173 Google reviews. This guide is published under Ian Lynch — 22 years in dental IT; oversees the NOC, onsite dispatch and client technology roadmaps.
If you want this reviewed every spring as part of a monthly plan rather than as a one-off, see the guide to managed IT for dental practices in Phoenix, which treats heat as a hardware line in the agreement. For the national picture of what a dental-focused provider covers, start with Legend's page on dental IT support.
What should you do before next summer?
Finish these eight items before June, when the long run of hot days usually begins and well before the monsoon storms arrive. Each takes an afternoon or less, and together they turn the next storm evening into a routine instead of a scramble.
The before-June checklist
- [ ] Read the closet. Place a thermometer or logger in May, keep it through the first hot weeks, and compare the readings with each device's spec-sheet range.
- [ ] Fix the closet. If readings are close to the top of a range, agree a fix with your provider: an exhaust fan, a vent, a dedicated cooling unit, a new location for the equipment, or moving the server to the cloud.
- [ ] Check every UPS. Run the self-test, read the battery install date and ask your provider whether it is due for replacement before the heat.
- [ ] Label what is plugged in. Server, firewall, switch and modem on battery; everything else on surge protection or off the UPS.
- [ ] Write and post the orders. Shutdown trigger, shutdown order, restart order and the utility account number, taped inside the closet door, with a named lead for each shift.
- [ ] Bookmark the maps and sign up for alerts. SRP or APS for each location, NWS Phoenix, and your carrier's outage page.
- [ ] Test the second internet path. Unplug the main line on a quiet afternoon and confirm the phones, the practice software and card terminals keep working.
- [ ] Restore from backup. Ask your provider to restore a sample of files and a copy of the practice database from offsite, and to show you the result.
If the office is still being built, most of this can be designed in rather than fixed later; the guide to IT for a new dental office in Phoenix covers where the network closet goes and how to plan it for summer. If imaging rooms are your worry, the guide to dental software and imaging support in Phoenix looks at imaging PCs and operatories in the heat.
If you would like a second pair of eyes on the closet, the UPS and the backup before the season, start with a Free Dental IT Assessment.
What to ask your IT provider about heat and monsoon season
Use these eight questions in your next review or when comparing providers for dental office IT in Phoenix. Ask for the answers in writing.
- Which of our devices are closest to the top of their spec-sheet temperature range in July, and what do you recommend we change?
- How old is each UPS battery, when was each last self-tested, and when will you replace it?
- What is our written shutdown trigger, and who is allowed to start it on each shift?
- Can you shut our server down remotely during a storm, and has that been tested this year?
- Which utility serves each of our locations, and are the outage alerts going to someone who will act on them?
- Does our second internet connection share a pole, conduit or carrier with the first one?
- When did we last restore from the offsite backup, and what did we restore?
- After an outage, what do you check before we see patients, and how do you tell us it is done?
Key takeaways
- In 2024 Phoenix reached 110°F or higher on 70 days and stayed in triple digits for a record 113 straight days; closet heat ages dental IT equipment over months, not in one afternoon.
- APC's battery guidance says every 8°C (15°F) rise in temperature cuts a UPS battery's life in half, so batteries in a warm Valley closet need checking every spring.
- The August 25, 2025 storm cut power to up to 54,000 SRP and 12,000 APS customers, from Chandler–Gilbert to Buckeye; know which utility serves each address.
- APS's planned shutoff program names parts of Pinal and four other counties, not Maricopa; Pinal offices plan for it, central Phoenix offices plan for storms.
- Power down from the edges in, restart in reverse, and check the backup before the first patient; write the order down and name who starts it.
Sources
- National Weather Service figures for Phoenix 2024 (110°F or higher on 70 days, typical 21; triple digits for 113 straight days, previous record 76; average 78.6°F): KJZZ, "2024 will likely be confirmed as Phoenix's hottest year ever", January 1, 2025, updated January 3, 2025. Accessed October 26, 2026.
- Monsoon storm of August 25, 2025 (SRP up to 54,000 and APS up to 12,000 customers without power; largest outage areas; next-morning counts; NWS warnings for Maricopa and Pinal counties): azfamily.com, August 25, 2025, updated August 26, 2025. Accessed October 26, 2026.
- APS Public Safety Power Shutoff (counties, notice, daylight restoration): aps.com/psps. Accessed October 26, 2026.
- APS Outage Center: aps.com/outages. Accessed October 26, 2026.
- SRP Power outages and storm safety: srpnet.com/customer-service/safety/outages-storm. Accessed October 26, 2026.
- National Weather Service Phoenix: weather.gov/psr, and Monsoon Safety, weather.gov/psr/MonsoonSafety. Accessed October 26, 2026.
- UPS battery life and temperature: Schneider Electric (APC), "What is the expected life of my APC UPS VRLA battery?", se.com FAQ FA158934. Accessed October 26, 2026.
Frequently asked questions
How hot is too hot for a dental office server closet in Phoenix?
There is no single number for every office. Each device's spec sheet states the temperature range it is built to run in, and that range is the limit that applies. Measure the closet at about 3 p.m. on a July weekday and over a weekend with the after-hours thermostat setting, then compare. A reading near the top of any device's range means the closet needs a fix before next summer.
What should a dental office do when a dust storm warning is issued for the Valley?
Save and close open charts and images, close the closet door and any vent to the outside, and have the shift lead watch the lights. If the power flickers or fails, start the written shutdown order: imaging PCs, then workstations, then the server last, with the firewall, switch and modem left on the UPS. Check the SRP or APS outage map for your address before restarting.
How do we find out whether our dental office is on SRP or APS?
Look at the electric bill for the suite; the utility's name and the account number are on it. If power is part of your lease, ask the property manager which utility serves the building and whose name the account is in. Bookmark that utility's outage map, sign up for its alerts, and tape the account number inside the closet door with the restart order.
Can an APS Public Safety Power Shutoff affect a dental office in Pinal County?
It can. APS names parts of Pinal County, along with Coconino, Gila, Navajo and Yavapai, as areas where a planned shutoff could happen; Maricopa is not named. APS says it gives notice by email, text or phone and restores power during daylight if lines are undamaged. Keep your account contacts current and run a full shutdown the evening before.
Should a Phoenix dental office have a second internet connection for monsoon season?
For most practices that run cloud software, internet phones or online claims, yes. The second connection should fail differently from the first: a different carrier or technology that does not share the same pole or conduit, with the firewall set to switch over automatically. Test it before summer by unplugging the main line on a quiet afternoon and checking phones, software and card terminals.
Do UPS batteries wear out faster in Phoenix heat?
Yes. Schneider Electric's guidance for APC batteries says most last three to five years, that every 8°C (15°F) rise in temperature cuts battery life in half, and that the battery inside a UPS runs warmer than the room. In a warm Valley closet, check each battery's install date and self-test result every spring, and plan replacements before the heat.
What should we check after a monsoon outage before seeing patients?
Check the closet for dust, alarms and heat, then confirm the internet and network gear are up before starting the server. Once the server has finished starting, open the practice software and a chart, take a test image from each sensor, ask your IT provider to confirm the backup ran or was rerun, and place test calls and a test card transaction.
Should a Phoenix practice move its server to the cloud because of the heat?
Heat alone is rarely the whole reason. Cloud practice software removes the server from your closet, but the firewall, switch, workstations, imaging PCs and internet connection stay in the building through the same summers, and the internet becomes more important. If the server is due for replacement anyway, compare both options on cost, internet reliability and imaging needs, not temperature alone.
The bottom line
If you want to know where your office stands before next summer, Legend Networking invites Valley practices to request a Free Dental IT Assessment. Bring your closet readings, your UPS labels and your last backup report, and use the findings to decide what to fix before June.