AEP Outages, Ordered Blackouts and Snow Emergencies: A Continuity Plan for Columbus Dental Offices
On January 25, 2026, Franklin County closed its roads under a Level 3 snow emergency, and any office without forwarded phones had calls ringing into an empty building. On August 11, 2026, an 82 mph gust was reported at John Glenn International and more than 210,000 Ohio customers lost power. A Columbus dental office gets through days like those far better with the plan written down before they arrive.
Legend Networking's page on dental IT support in Columbus explains how Legend works with practices here. This guide turns the short answer into a Columbus dental office power-outage and snow plan you can print: the five ways a Central Ohio dental office loses power or connection, the first 15 minutes, what goes on battery, a snow-emergency operating sheet, and the order in which to bring everything back. For the broader picture, from utilities to internet carriers across the region, see the Columbus dental IT guide.
What to take from this guide:
- Central Ohio has three electric utilities, and the right outage page depends on your address.
- In June 2022, the grid operator ordered power cut to parts of Columbus during a heat wave, the day after storms had passed. Outages here do not always come with a storm overhead.
- Battery backup is for an orderly shutdown and short blips, not for running a clinic.
- A Level 3 snow emergency keeps staff home; remote access and call forwarding have to be ready before it is declared.
- Bring systems back in a fixed order, and check the backup last.
Know which utility serves your office. Put the server, network and imaging computers on battery backup with a written shutdown order. Keep a tested backup copy outside the building. Before winter, set up secure remote access for the front desk and write down how to forward the phones. Then practice the plan once.
- Central Ohio has three electric utilities (AEP Ohio, Columbus Division of Power and Westerville's city utility), and the right outage page depends on your address.
- In June 2022 the grid operator PJM directed AEP to shed load during a heat wave, the day after storms had passed; AEP had five minutes to act.
- Battery backup is for an orderly shutdown and short blips, not for running a clinic.
- Franklin County's Level 3 snow emergency on January 25, 2026 limited roads to essential travel; remote access and call forwarding have to be ready before one is declared.
- Bring systems back in a fixed order (power, network, server, practice software, imaging, phones) and check the backup last.
In this guide
- Which utility powers your office: AEP Ohio, Columbus Division of Power or Westerville's city utility?
- How does a Columbus dental office go dark?
- Why has the Central Ohio grid been under more strain since 2020?
- What should happen in the first 15 minutes of an outage?
- Which equipment needs battery backup, and which can simply shut down?
- What does a Level 3 snow emergency mean for your schedule, phones and staff?
- What if the internet goes down but the lights stay on?
- Where should a Columbus practice keep its offsite backup?
- In what order should the office come back up?
- How Legend supports a Central Ohio office
- What to ask your IT provider
- Frequently asked questions
- The bottom line
Which utility powers your office: AEP Ohio, Columbus Division of Power or Westerville's city utility?
Check your electric bill. Most Central Ohio offices are on AEP Ohio, whose 2025 fact sheet says it serves 1.5 million customers. Part of the City of Columbus is served by the city's own Division of Power, and Westerville runs its own electric utility. Each has its own outage page, alerts and contacts, so your plan should name the one that serves your address.
It sounds basic, but it is the first line of the plan for a reason. When the power goes out, the front desk will pick up a phone and look for an outage map. If they open the wrong utility's page, they will see nothing about your street and lose time. And restoration is run by whichever utility owns the line to your building, so only that one can say when your street should be back.
The three utilities in a sentence each:
- AEP Ohio. The large investor-owned utility for most of Central Ohio. Its 2025 fact sheet says it serves 1.5 million customers, with headquarters in Gahanna.
- Columbus Division of Power. The City of Columbus describes it as "a full-service, publicly owned electrical utility" that delivers power through its own distribution system to part of the city. The city publishes a service-area map.
- Westerville's electric utility. Westerville established its own electric division in 1898, and American Municipal Power calls Westerville "the only suburban electric utility provider in central Ohio."
What to do with the answer:
- Write the utility's name at the top of your outage plan.
- Sign the office up for that utility's outage alerts, using a phone number that someone will see after hours.
- Save the utility's home page on the office manager's and the owner's phones. We link only the home pages here: aepohio.com, columbus.gov/power and Westerville's city website. Find the outage section from there.
- If you have more than one office, check each address separately. A practice in Clintonville and a second office in Westerville may be on two different utilities.
Never guess a suburb's utility from its name. Dublin, Hilliard, Grove City and Worthington addresses should all be checked on the bill.
How does a Columbus dental office go dark?
In five ways: an ordered load shed on the grid, a summer wind storm, a winter storm with a snow emergency, a cut internet line while the power stays on, and an outage that affects only your building. Each one gives a different warning and stops different things first, so each needs its own first moves. The table puts them side by side.
Table A. Five ways a Columbus dental office goes dark
| Event | Warning you may get | What stops first | First moves | What must already be in place |
|---|---|---|---|---|
| Grid emergency load shed (example: June 14, 2022, when the regional grid operator PJM directed AEP to shed load, the day after storms, in a heat wave) | Little or none. AEP had five minutes to act on the directive | Everything on wall power, all at once | Patient safety; save and close charts; let the battery backup carry an orderly shutdown | Battery backup on server and network; a printed shutdown order; the utility's outage page saved |
| Summer wind storm (example: August 11, 2026, when an 82 mph gust was reported at John Glenn International and more than 210,000 Ohio customers lost power) | A weather warning, often the same day | Power, sometimes more than once as lines trip and reset | Shut down in order instead of riding repeated flickers; unplug nothing by hand while lines are down outside | Battery backup that has been tested; an offsite backup; a call list |
| Winter storm and snow emergency (example: January 25, 2026, Franklin County's Level 3 snow emergency during the January 24–25 snowstorm) | Usually a day or more of forecasts | Staff cannot get in; power may or may not fail | Decide early who comes in; forward phones; switch scheduling and patient calls to remote work | Remote access with multifactor sign-in; written call-forwarding steps; a patient call list |
| Fiber or cable cut with the power still on (example: Hilltop, Columbus, Dec. 31, 2023 to Jan. 2, 2024, when gunshots struck Spectrum fiber and service was out for over 43 hours) | None | Internet: cloud software, card payments, internet phones, email | Fail over to the second line; check what still works; call the carrier | A second internet path; a list of what runs on the backup line |
| Building-only outage (a tripped breaker, landlord work, a failed transformer serving the building) | Sometimes a landlord notice; often none | Your suite only | Check the panel and the landlord before calling the utility | The landlord's maintenance contact; a labeled electrical panel |
Two points stand out from the table. First, the load shed and the fiber cut both arrive without a storm to warn you, so the plan cannot depend on a forecast. Second, the snow emergency often leaves the power on: the problem is getting people in. A plan built only around generators and batteries misses it entirely.
If you would like your own office checked against this table, ask for a Free Dental IT Assessment.
Why has the Central Ohio grid been under more strain since 2020?
Demand grew quickly in the early 2020s. POWER Magazine reported that Central Ohio's data-center load rose from about 100 megawatts in 2020 to about 600 megawatts in 2024, that AEP Ohio paused new data-center service agreements in the region in March 2023, and that state regulators approved a data-center tariff on July 9, 2025. The practical point for a practice is simple: plan as though grid events can happen.
This is not a prediction that your office will lose power more often. Nobody can make that forecast honestly, and we do not try. It is context for a plan. A grid serving fast-growing demand has less slack when a heat wave and damaged lines arrive in the same week, which is exactly what happened in June 2022. WOSU reported at the time that AEP's load shedding left "tens of thousands of Columbus residents in the dark," and an AEP manager told the station, "we're doing this to protect the integrity of the entire grid."
There is a cost side too, though it mostly affects homes. WOSU reported in December 2025 that an average residential customer could pay about $36 a month more by 2027 across AEP Ohio, Columbia Gas and Columbus Water if the increases proposed at the time were approved; your utility's current rate pages show what applies today. For a practice, the useful response is modest: retire servers and computers that run hot and old, and do not leave equipment running that nobody uses.
What this means for your plan:
- Assume an outage can happen in fair weather and with little notice.
- Keep the battery backup sized for an orderly shutdown, and test it.
- Keep the offsite backup current, so a sudden shutdown never costs you more than part of a day's work.
What should happen in the first 15 minutes of an outage?
Look after patients first, then protect the data. Clinical equipment and patient safety are the dentist's call, guided by each equipment maker's instructions. Meanwhile, the front desk saves open work and closes the practice software, the battery backup carries the server and network through an orderly shutdown, and someone checks the utility's outage page from a phone and calls for help if needed.
Keep a printed copy of these seven steps at the front desk and another inside the closet door.
- Patients first. The dentist decides what happens with any patient in the chair. Follow each equipment maker's guidance for clinical devices; IT has no role here.
- Save and close. Every staff member saves what is open and closes the practice software. A database closed cleanly is far less likely to need repair.
- Let the battery do its job. The battery backup units keep the server and network running long enough for an orderly shutdown. Shut the server down through its normal process, not with the power button. The usual errors are collected in server shutdown mistakes to avoid.
- Imaging computers off in order. Close the imaging software, then shut each acquisition computer down normally.
- Note the time. Write down when the power went out and what was running. It helps later when you check for missing work.
- Check the utility. From a phone, open your utility's outage page and see whether the outage is reported for your area.
- Call for help if you need it. Ring the helpdesk: Legend's is staffed 24/7 at 1-800-794-1588, a single general number.
When the power flickers on and off, resist turning everything back on at the first return. Wait until the utility reports the area restored or the power has been steady for a while. Restarting a device and fully cycling its power are different steps, and restart vs power cycle in a dental office shows when each one fits.
Which equipment needs battery backup, and which can simply shut down?
Anything that holds data or carries the network needs a battery backup unit: the server or storage device, the firewall, the switch, the modem or fiber terminal and the phone system. Front-desk and imaging computers benefit from one too. Printers do not need one. Size every unit with your installer and test it twice a year, because batteries weaken with age.
We do not give runtimes here. They depend on the unit, the load and the battery's age, and a number from an article is no substitute for testing your own equipment.
Table B. Battery backup by device
| Device | Battery backup? | Why | What to check each quarter |
|---|---|---|---|
| Server or storage device | Yes | Holds the practice database and images; a hard power loss risks corruption | The unit's self-test result; that shutdown signaling to the server still works |
| Firewall | Yes | Keeps the office connected and protected through short blips | Unit status light and test |
| Network switch | Yes | Every computer and wired phone depends on it | Unit status and test |
| Modem or fiber terminal | Yes | Without it, the internet and internet phones stop | That it is plugged into the battery side, not the surge-only side |
| Phone system | Yes | Lets calls keep coming in during a short outage | Unit test; the carrier's own battery, if any |
| Front-desk computer | Yes, at least one | Lets the desk save work and check the schedule | That the battery still holds it through a brief unplug test |
| Imaging acquisition computers | Recommended | Time to close software and save images | Unit test |
| Panoramic or cone-beam unit | Follow the vendor's guidance | Large units have their own power requirements | Ask the equipment vendor; do not improvise |
| Printers | No | Laser printers draw heavily and can overload a battery unit | That nobody has plugged one into a battery outlet |
| Wi-Fi access points | Powered through the switch | They stay up if the switch is on battery | That the switch's battery unit covers them |
Two habits keep this table true. Label every battery unit with its install date and what is plugged into it. And replace batteries on the maker's schedule, not when they fail during an outage.
What does a Level 3 snow emergency mean for your schedule, phones and staff?
It means your staff should not be on the roads. Ohio law lets each county sheriff declare snow emergency levels, and at Level 3 roadways are limited to essential employees or people with a personal emergency. A dental office should treat Level 3 as a closed day, run scheduling and patient calls remotely, and have phones forwarded before anyone would normally leave home.
Franklin County reached Level 3 on January 25, 2026. The sheriff's office placed the county under a Level 3 snow emergency at 11:37 a.m. that day, and the sheriff said it appeared to be the first in county history; it was lifted at noon the next day and downgraded to Level 2. The National Weather Service recorded 11.9 inches of snow at Columbus on January 25, a record for the date, and 12.0 inches over the two-day storm. Because sheriffs declare by county, a practice in Franklin County and a team member who lives in Delaware or Licking County may face different levels on the same morning.
As Spectrum News described the levels in January 2026: Level 1 "encourages caution," Level 2 advises people "to check with their employers before reporting to work in-person," and Level 3 "limits roadways to essential employees or people experiencing a personal emergency." Use the operating sheet below to decide in advance what your office does at each level.
Table C. Snow-emergency operating sheet for a Columbus dental office
| County level | Who comes in | What runs remotely | How phones route | Who calls patients | What must already be set up |
|---|---|---|---|---|---|
| Level 1 | Normal schedule for those who can travel safely; the owner decides on late starts | Nothing extra; confirm remote access works in case the level rises | Normal | Front desk calls any patient who asks to reschedule | Remote access tested within the past six months; call list current |
| Level 2 | Only those who live close and can travel safely; the owner decides whether to see patients | Scheduling, insurance follow-ups and patient messages from home | Forwarded to a cell phone or a remote answering setup if the office closes | Front desk lead, from home, works through the day's list | Written call-forwarding steps; schedule reachable from outside the office; multifactor sign-in for remote users |
| Level 3 | Nobody, unless the dentist has a true emergency patient and safe travel | Rescheduling, patient messages, insurance work and email | Forwarded before staff would normally leave home | Front desk lead and one backup, from home, using a script | All of the above, plus a decision on who forwards the phones and by what time |
How to make the sheet work in practice:
- Remote access with multifactor sign-in. Front-desk staff need a secure way to reach the schedule from home: a remote desktop or VPN connection protected by a second factor, or a cloud-reachable schedule. Test it in November, from each person's home, not on the day of the storm.
- Call-forwarding steps, written down. Whoever forwards the phones needs the steps on paper or on their phone, plus the number calls should go to. If your phone service is internet-based, forwarding is often done from an app or portal; if it is a traditional line, ask the carrier how.
- A patient script. One short paragraph for rescheduling calls, so every patient hears the same thing.
- A decision time. Agree when the owner makes the call to close. Early is better: patients and staff both need time to change plans.
What if the internet goes down but the lights stay on?
Switch to your second internet path and keep working on the tasks that fit it. A second wired line from a different carrier is the strongest backup; a cellular backup is a cheaper option and is usually slower than your main line. Decide in advance which tasks run on the backup, and which wait until the main line is restored.
The Hilltop outage is the local example. Spectrum customers there lost service from 10:30 p.m. on December 31, 2023, until about 6 p.m. on January 2, 2024, more than 43 hours, after gunshots struck the carrier's fiber. The power stayed on. An office on that line with no second path would have lost its cloud software, internet phones, card payments and email at the same time.
Choosing a second path. As of November 2026, business internet listings for Columbus named AT&T, Spectrum, WOW!, Everstream, Breezeline, Lumen and Zayo; which ones reach your building varies. Ask for a second carrier whose cable takes a different route into the building. If no second carrier is available, a cellular backup is better than nothing, but measure what your office actually uses before you rely on it.
What fits on a backup line, and what waits:
| Task | On a backup line? |
|---|---|
| Practice software (cloud or remote access) | Yes, top priority |
| Card payments | Yes |
| Internet phones | Yes, if the line can carry them; test it |
| Yes | |
| Uploading large imaging files to the cloud | Usually waits for the main line |
| Offsite backup transfer | Waits; let it catch up after |
| Software updates | Wait |
The day-of steps for a dropped line are in what to do when the dental office internet is down.
Where should a Columbus practice keep its offsite backup?
Out of the building, and away from anything that would fail at the same time as the office. A copy on a drive in the same closet does not survive a fire, a flood or a stolen server. Keep an encrypted copy offsite, run backups on a schedule that fits the clinic day, and prove they work with a test restore every quarter.
Three practical rules:
- Separate the copies. A local copy gives quick restores; the offsite copy covers the day the building is the problem. Both are needed.
- Schedule around the patient day. Columbus runs on Eastern time. Run the large backup after the last appointment and finish it before the first morning login, so it never slows charting.
- Test restores. A backup that has never been restored is unproven. Restore a file and a database copy each quarter, and write down that it worked.
Legend publishes "Backup protection from $39.99 per month (storage-dependent)." What a dental backup service covers is on the backup and recovery page, and the dental backup and disaster recovery checklist is a good way to check your current setup.
In what order should the office come back up?
Bring systems back in a fixed order: confirm the power is stable, then the network, then the server, then the practice software and front desk, then imaging, then phones, and only then let backups resume. Starting computers before the server is ready causes errors that look like new problems. Finish with a short written note of what happened.
Table D. Reopening order
| Step | What to do | Check before moving on |
|---|---|---|
| 1. Power stable | Wait until the utility reports the area restored or the power has been steady | No flickers |
| 2. Network | Turn on the modem or fiber terminal, firewall and switch | Internet lights normal; a computer can reach a website |
| 3. Server | Start the server | It finishes starting and the practice database service is running |
| 4. Practice software | Open it on one workstation first | A test patient opens |
| 5. Front desk | Start the other front-desk computers | Schedule visible on each |
| 6. Imaging | Start the acquisition computers and imaging software | A test image opens from the chart in each operatory |
| 7. Phones | Confirm calls come in and forwarding is turned off | An outside call rings at the desk |
| 8. Backups resume | Confirm the next scheduled backup runs | The backup log shows a success |
| 9. Incident note | Write down the time out, time back, what failed and what to change | Note filed with the plan |
If any step fails, stop there and call for help rather than pushing on. Who should own this list over time, and keep the plan current, is covered in the companion guide to managed IT for dental practices in Columbus. If you are still building your office, design these steps in from day one; the guide on IT for a new dental office in Columbus shows where battery backup and a second internet line fit in the build calendar.
How Legend supports a Central Ohio office
Legend Networking is headquartered in Dallas, and Columbus is one hour ahead of Dallas all year. The helpdesk is staffed 24/7 at one general number, and 24/7 monitoring is a separate service that watches systems whether or not anyone calls. Legend publishes "In-house engineers; no outsourced first-level triage" and "Onsite dispatch by appointment across served dental markets; remote-first nationwide." Day-to-day software and support issues are handled remotely; cabling, installations, equipment moves and new-office build-outs are scheduled onsite by appointment.
Legend has 22+ years in dental IT (since 2004), has served over 3,500 practices since 2004, and holds a 4.8 rating · 173 Google reviews. Ian Lynch's published role reads: "22 years in dental IT; oversees the NOC, onsite dispatch and client technology roadmaps." For practices across the metro, including the north side, the page on dental IT support in Westerville explains how to begin. Owners comparing options will find the scope of IT support for dental offices in Columbus set out there too.
What to ask your IT provider
Ask these before winter, and get the answers in writing.
- Which utility serves our office, and is it written in our plan?
- When was each battery backup unit last tested, and when are the batteries due for replacement?
- Can the front desk log in from home with multifactor sign-in, and has each person tested it within the past six months?
- Where is our offsite backup, and when did we last restore from it?
- What is our second internet path, and which tasks run on it?
- Who forwards our phones in a snow emergency, and where are the steps written?
- Who calls us when the monitoring sees the server go offline?
- What order do we follow to bring the office back, and who checks each step?
Frequently asked questions
How do we find out whether our office is on AEP Ohio, Columbus Division of Power or Westerville's city utility?
Look at your electric bill; the utility's name is on it. If you lease, ask the landlord. Most Central Ohio addresses are on AEP Ohio, part of the City of Columbus is on the city's Division of Power, and Westerville runs its own utility. Never guess from the suburb's name. Write the answer at the top of your outage plan and sign up for that utility's alerts.
Can AEP Ohio cut power to a Columbus office during a grid emergency even when no storm is overhead?
Yes, it has happened without a storm overhead. On June 14, 2022, the day after storms and during a heat wave, the regional grid operator PJM directed AEP to shed load, and AEP had five minutes to act. Tens of thousands of Columbus residents lost power. That is why battery backup, a printed shutdown order and an offsite backup matter even in fair weather.
What should a Columbus dental office do in the first 15 minutes of a power outage?
Look after patients first; clinical equipment is the dentist's call, guided by the maker's instructions. Then save and close the practice software, let the battery backup carry the server and network through a normal shutdown, and turn off imaging computers in order. Note the time, check your utility's outage page from a phone, and call your IT helpdesk if anything does not shut down cleanly.
Which devices need a UPS, and which can just shut down?
Put the server or storage device, firewall, switch, modem or fiber terminal and phone system on a UPS, plus at least one front-desk computer. Imaging computers benefit from one. Follow the vendor's guidance for a panoramic or cone-beam unit, and never plug a laser printer into a UPS. Size each unit with your installer and test it twice a year.
What should our office do when Franklin County declares a Level 3 snow emergency?
Treat it as a closed day. At Level 3, roads are limited to essential employees and people with a personal emergency, so staff should stay home. Forward the phones before anyone would normally leave, run rescheduling and patient messages from home with secure remote access, and use a short script so every patient hears the same thing. Set this up in November, not on the morning of the storm.
How can the front desk keep answering calls when the office is closed for snow?
Before opening time, send the main number's calls to a staff cell phone or a remote answering setup. Internet phone systems usually allow forwarding from an app or web portal; for a traditional line, ask the carrier. Write the steps down, name who does it and by what time, and test it once before winter. Remember to turn forwarding off when the office reopens.
Where should a Columbus dental practice keep its offsite backup?
Keep an encrypted copy outside the building, separate from anything that would fail with the office, plus a local copy for quick restores. Schedule the large backup after the last Eastern-time appointment so it finishes before morning logins. Most important, restore a file and a database copy each quarter and record that it worked, because an untested backup cannot be relied on.
What should we do if our internet line is cut but the power is on?
Switch to your second internet path and run only the tasks that fit it: practice software, card payments, internet phones and email. Let large imaging uploads, offsite backup transfers and updates wait for the main line. Call the carrier to report the outage. If you have no second path, plan one before you need it: a second wired carrier is strongest, and cellular backup is the cheaper option.
How often should a Columbus dental office test its outage plan?
Test the battery backup units twice a year, restore from the backup every quarter, and run a short walk-through of the whole plan each November before snow season. In the walk-through, each person logs in from home, the phones are forwarded and returned, and someone reads the shutdown and reopening steps aloud. Update the plan whenever staff, equipment or your internet carrier changes.
The bottom line
A written plan takes an afternoon to draft and a season to prove. If you would like your office's battery backup, backups, remote access and phones reviewed against this guide, you are welcome to request a Free Dental IT Assessment, whether you are in Westerville, Dublin, Grove City or downtown Columbus.