The service side, including what Legend Networking supports, is on the page for dental IT support in Sacramento. This guide sits under the Sacramento dental IT guide and is the operating plan for one person: the office manager who keeps charts, imaging and phones working when the valley weather turns. It follows the Sacramento region's own calendar, which differs from the wildfire-shutoff plans written for the Bay Area or the monsoon plans written for Arizona. Nothing here predicts when or where a utility will lose power.
A Sacramento-region dental office plans for two seasons and three utilities. Check the utility on your bill, prepare for wind and rain from November to March and heat from June to September, keep the closet cool on weekends, put the network and server on battery with a shutdown order, keep a tested offsite backup, and set call forwarding.
- A Sacramento dental office plans for two seasons: wind and rain from November to March and heat from June to September.
- The utility on your bill (SMUD, Roseville Electric or PG&E) decides which outage pattern and which alerts apply.
- SMUD's territory is outside the high-fire-threat designation, so valley outages have mostly come from windstorms, not wildfire shutoffs.
- A small closet can give off about 2,150 BTU per hour; on a hot weekend with cooling set back, that heat has nowhere to go.
- Put the server, firewall, switch, modem and phone system on battery with an automatic shutdown, and keep a tested backup outside the valley, a backup internet connection and written call-forwarding steps.
- Bring the office back in order: power, cooling, network, server, software, PCs, imaging, phones, backups.
In this guide
- Is your office on SMUD, Roseville Electric or PG&E?
- When in the year is a Sacramento dental office most likely to lose power?
- Why do windstorms, not wildfire shutoffs, darken most valley offices?
- How hot does a closed server closet get on a Sacramento weekend?
- What should the office do when SMUD or the state grid asks customers to conserve?
- What should a foothill office do differently?
- Which equipment in a Sacramento office needs battery backup, and which can shut down?
- What if staff cannot reach the office when Highway 99 or a levee road closes?
- What if the internet goes down in a valley storm but the lights stay on?
- Where should a Sacramento practice keep its offsite backup?
- When SMUD or PG&E restores power, what comes back first?
- Where does Legend fit in a Sacramento power plan?
- What to ask your IT provider
- Key takeaways
- Sources
- Frequently asked questions
- The bottom line
Is your office on SMUD, Roseville Electric or PG&E?
Most valley offices are on SMUD, offices inside Roseville city limits are on Roseville Electric, and offices in the Placer, El Dorado and Yolo communities around the edge are usually on PG&E. The utility name printed on your electric bill settles it. That one fact decides which outage pattern you plan for and where your alerts come from.
The three utilities behave very differently, and that is the local reason this plan exists.
SMUD (the Sacramento Municipal Utility District) covers about 900 square miles centred on Sacramento County. That takes in Midtown, Natomas, the Pocket, Elk Grove, Rancho Cordova and, for most addresses, Folsom. SMUD states on its wildfire page that "Sacramento County is not designated as a high fire threat area." It also says it "may as a last resort temporarily turn off power to protect public safety", and it places its biggest wildfire risk in the forested area around its hydroelectric facilities in El Dorado County. For a valley office, SMUD's history points to wind, rain and heat as the events to plan for.
Roseville Electric is the City of Roseville's own utility, "community-owned... since 1912". It serves nearly 7,300 commercial customers across 43 square miles, and the city says 86% of its electric infrastructure is underground, with a target of 87% by 2029. Underground lines are less exposed to falling limbs. They do not make an office immune to equipment failures, heat-driven grid emergencies or a carrier outage, so a Roseville office still needs batteries, backups and a phone plan.
PG&E serves the Placer communities around Roseville, including Rocklin, Lincoln, Granite Bay and Loomis. Offices in Auburn, El Dorado Hills, Placerville, Davis, Woodland and West Sacramento should check the name on the bill; many are on PG&E, which puts them inside the footprint of its Public Safety Power Shutoff program. That program is covered in one section below, for foothill offices only.
Table B. Which utility, which plan
| Utility | Typical places (check your bill) | Outage pattern that matters most | Where alerts come from | What the office sets up |
|---|---|---|---|---|
| SMUD | Midtown, East Sacramento, Land Park, the Pocket, Natomas, Elk Grove, Rancho Cordova, most of Folsom, Galt edge | Winter windstorms and atmospheric rivers bringing trees onto lines; heat-wave afternoons when the grid is short | Outage and account alerts on your SMUD business account; SMUD's news releases during big storms | Battery backup on the closet, a written shutdown order, a weekend closet temperature alert, call-forwarding steps, remote front-desk access |
| Roseville Electric | Addresses inside Roseville city limits | Fewer overhead-line failures, since most lines are underground; still exposed to equipment faults and regional grid emergencies | Account alerts from the City of Roseville utility | The same battery, backup and phone plan; ask the landlord about the building's own electrical gear |
| PG&E | Rocklin, Lincoln, Granite Bay, Loomis; often Auburn, El Dorado Hills, Placerville, Davis, Woodland, West Sacramento | Storm outages plus possible PSPS events on dry, windy days, with notice in advance | PG&E account alerts; the PSPS address look-up at pge.com/pspsupdates | Everything above, plus PSPS alerts registered to the office address with more than one recipient |
If your practice has more than one office, fill in a row for each address. A group with an Elk Grove office on SMUD and an Auburn office on PG&E is running two different plans; the foothill section below explains how the two connect.
If you would like someone to fill in Table B for your own address and closet, a Free Dental IT Assessment starts with exactly that inventory.
When in the year is a Sacramento dental office most likely to lose power?
The dated record shows two seasons. From November to March, windstorms and atmospheric rivers have caused the region's largest outages. From June to September, heat stresses closets and has pushed the grid to the edge. PG&E shutoff watches for foothill communities tend to come with dry, windy weather in late summer and autumn.
The table below turns the record into a calendar. It lists what happened; it is a guide to what to prepare for, and no forecast for any year.
Table A. The Sacramento two-season risk calendar, built from dated events
| Season | Dated event | What it did | The lesson for a dental office |
|---|---|---|---|
| Heat (Jun-Sep) | 6 September 2022 | Downtown Sacramento reached 116°F, beating the 114°F record from July 1925. SMUD urged customers to conserve because it expected shortfalls that could lead to rolling outages, a step the Sacramento Bee reported it had not taken in more than two decades. | A conservation call is a warning to protect cooling and batteries, and to finish heavy imaging early in the afternoon. |
| Heat (Jun-Sep) | 24 September 2024 | Downtown recorded its 45th day of 100°F or more in 2024, a record against an average of about 23. | Closets get tested for weeks, including weekends when the building's air conditioning is set back. |
| Late summer to autumn (PG&E edges) | 12-14 September 2026 | PG&E's PSPS watch listed 729 customers in El Dorado County, 1,246 in Placer and 9 in Yolo in its initial scope. Sacramento County did not appear on the list. Notices went out about two to three days ahead. | Foothill offices plan for shutoffs on clear, windy days; valley SMUD offices plan for storms and heat instead. |
| Wind and rain (Nov-Mar) | 31 December 2022 to 1 January 2023 | The New Year's Eve storm put more than 180,000 SMUD customers out at its height. Over the holiday weekend, levee failures on the Cosumnes River near Wilton flooded south Sacramento County, and Highway 99 near Elk Grove closed between Grant Line Road and Dillard Road. | The first storm of a series is rarely the last. Staff from Galt and south Elk Grove may not be able to drive in. |
| Wind and rain (Nov-Mar) | 31 December 2022 to mid-January 2023 | SMUD's year in review: about 600,000 customers lost power across three weeks of storms, with 70+ mph winds and 17 inches of rain. | Expect repeat outages for weeks, recheck the UPS between storms, and decide in advance who calls patients on a day with no reliable opening. |
| Wind and rain (Nov-Mar) | 4 February 2024 | SMUD reported 65+ mph winds and storm damage that knocked out power to about 200,000 of its customers. | A single February windstorm can still darken a large share of the valley. |
Two things stand out. The largest valley outages on this list came from wind and rain, and the heat season brought a grid warning and long runs of hot days instead. That is the reverse of a Bay Area plan, where shutoffs for wildfire risk lead.
The calendar as a to-do list:
- Early November: test the UPS batteries, update the phone tree and call-forwarding card, confirm a test restore from the offsite backup has run since the last storm season, and move anything stored on the closet floor.
- Between storms (December to March): after every outage, check that the UPS is charged and not alarming, and that the overnight backup ran.
- May: check the closet cooling before the first triple-digit week, confirm the temperature alert goes to two people, and ask the landlord how the building's air conditioning is scheduled on weekends.
- August: foothill offices confirm their PSPS alert recipients and the patient-call script.
Why do windstorms, not wildfire shutoffs, darken most valley offices?
SMUD's territory sits outside California's high-fire-threat designation, so shutoffs for wildfire risk are rare on the valley floor. The big valley outages have come from wind and saturated ground, when falling trees and limbs brought lines down across a city with a large tree canopy. For a SMUD office, a winter windstorm warning is the event that deserves a checklist.
Sacramento is proud of its trees. The city has a plan to grow its canopy from about 19% toward 35% by 2045. When a storm drops a tree on a line, the outage is sudden. There is no shutoff notice, and nobody knows in advance which block will go dark.
Inside a dental office, the failures arrive in a predictable order:
- The internet modem or fiber box loses power first if it is not on a battery, so cloud software, email and internet phones stop at once.
- The phones go silent if they run over the internet and the switch feeding them is not on a battery.
- Front-desk PCs shut off hard, losing anything unsaved in the practice-management software.
- The server or NAS keeps running on its UPS for a while. If no one has set an automatic shutdown, it crashes when the battery runs flat. A hard crash mid-write is how databases get damaged. The guide to server shutdown mistakes to avoid explains why the order matters.
The goal of the windstorm checklist is to make sure the first three are covered and the fourth shuts down cleanly.
Checklist D. Windstorm warning issued: the 30-minute list
Use this when the National Weather Service issues a wind warning for the Sacramento Valley during business hours, or the evening before.
| Minutes | Task | Who |
|---|---|---|
| 0-5 | Confirm last night's backup completed (the backup console, or ask your IT provider) | Office manager |
| 5-10 | Check the UPS status lights in the closet: on line, battery charged, no alarm | Office manager |
| 10-15 | Print or export tomorrow's and the next day's schedule with patient phone numbers | Front desk |
| 15-20 | Put the call-forwarding steps where staff can see them, and confirm which mobile number calls forward to | Front desk lead |
| 20-25 | Charge laptops, tablets and phones; plug in any battery packs | Everyone |
| 25-28 | Write down who opens tomorrow, who decides whether to open, and who calls patients if you do not | Owner and office manager |
| 28-30 | Lift anything sitting on the closet floor (boxes, spare equipment, the backup drive) onto a shelf | Whoever is nearest |
The list is short on purpose. It fits the last half hour of a working day, and every item on it protects something a storm can take: the data, the schedule or the phones.
How hot does a closed server closet get on a Sacramento weekend?
There is no single answer, because it depends on the equipment, the room and the building's air conditioning schedule. You can measure the heat the equipment produces, though. A typical small-office closet gives off around 2,000 BTU per hour, day and night, and on a hot weekend with the building's cooling set back, that heat has nowhere to go.
Sacramento's heat season makes this concrete. In 2024, downtown passed 100°F on 45 days. Many office buildings set the air conditioning back on Saturday and Sunday to save power. The server, the switch and the backup device keep running all weekend in a closed room.
Worked example C. The Saturday closet
The watts below are illustrative. Check the labels or spec sheets on your own equipment, which give the real figures.
| Device in the closet | Illustrative power draw |
|---|---|
| Server running the practice-management database | 300 W |
| PoE switch feeding the phones and Wi-Fi access points | 150 W |
| Firewall | 30 W |
| NAS used as the local backup target | 60 W |
| Phone system controller | 40 W |
| UPS losses (a UPS turns some power into heat even when idle) | 50 W |
| Total | 630 W |
Step 1: turn watts into heat. Nearly all the electricity this equipment uses ends up as heat in the room. One watt is about 3.412 BTU per hour, so 630 W × 3.412 ≈ 2,150 BTU per hour.
Step 2: count the weekend. From Friday 6 p.m. to Monday 7 a.m. is 61 hours. At 630 W, that is about 38 kilowatt-hours of heat released into a closet that may be a few feet across.
Step 3: compare with cooling. A ton of air conditioning is 12,000 BTU per hour. This closet alone needs roughly 18% of one ton running continuously. A building system set back for the weekend may deliver none of it to a small room with no return vent.
Step 4: compare with the safe range. ASHRAE's thermal guidelines for IT equipment, as summarised from its 2021 edition, give a recommended inlet temperature of 18°C to 27°C (64.4°F to 80.6°F) for common equipment classes. Each manufacturer also states an operating range on its spec sheet, and that is the figure that applies to your hardware. On a 105°F Saturday, a closed closet with a 2,150 BTU/hr load and no cooling can move well past that recommended band.
What fixes it, in rough order of cost:
- Clear the vents and the floor. Storage boxes against a door grille or in front of a fan block the only airflow the closet has.
- Ask the landlord for the weekend schedule. Find out whether the system serving your suite runs on Saturday and Sunday, and whether the closet has a supply and a return.
- Add exhaust. A ducted exhaust fan with a thermostat moves warm air out of a small room.
- Add a dedicated cooling unit. A small ductless split unit that runs independently of the building schedule is the usual answer for a closet that runs hot.
- Add a temperature sensor with alerts to two people. Many UPS network cards and environmental sensors can send an alert at a set temperature. Legend provides 24/7 monitoring; ask your provider which devices it watches and who receives each alert.
- Reduce the load. Retiring an old server, or moving a workload to the cloud, takes heat out of the room. That is a bigger decision with its own costs, and it does not remove the switch, firewall and modem.
Write down the closet reading on the first hot Saturday each June. If it sits close to the highest figure on any spec sheet, book the cooling work then, while July and August are still ahead.
When you are ready to have someone measure your own closet, list its equipment and check its batteries, ask for a Free Dental IT Assessment.
What should the office do when SMUD or the state grid asks customers to conserve?
A conservation call is a request to use less power during a heat-wave afternoon or evening. It is not an outage. On 6 September 2022, SMUD asked customers to conserve because it expected shortfalls that could lead to rolling outages. A dental office should keep its IT running, protect the closet cooling and be ready in case power drops.
Here is a short operating sheet for a conservation afternoon:
- Keep the server, network and phones on. Shutting them down saves very little power and creates a restart risk.
- Leave the closet cooling on. Turning off the closet unit to help the grid is the one saving that can cost you equipment.
- Move heavy imaging earlier. If a long CBCT session or a big batch of scans can move to the morning, do it, so a late-afternoon outage does not interrupt it.
- Check the UPS. Make sure nothing is alarming and the battery shows charged. If the power flickers, that is when it matters.
- Save and close the schedule edits. Ask the front desk to finish and save open records before 4 p.m. on the conservation day.
- Have the windstorm card ready. The call-forwarding and patient-call steps from Checklist D work for a heat outage too.
Lights, breakroom appliances and non-clinical equipment are where an office can actually save power. Ask your landlord whether the building has its own conservation steps.
Treat each alert day as a rehearsal: run the sheet, note what was awkward, and fix it before the next heat wave.
What should a foothill office do differently?
An office in El Dorado Hills, Placerville, Auburn or another PG&E community should register the office address for PG&E shutoff alerts, name more than one recipient, and plan for a shutoff on a clear, windy day. In September 2026, PG&E sent notices about two to three days ahead of a possible shutoff, which gives a foothill office time to prepare.
This is the one part of a Sacramento-region plan that looks like the Bay Area's. It applies only to offices on PG&E in fire-risk areas. During the September 2026 watch, the counties listed were El Dorado (729 customers), Placer (1,246) and Yolo (9). The look-up at pge.com/pspsupdates tells you whether a given address is being monitored.
What changes for a foothill office:
- The warning arrives early. Unlike a valley windstorm, a PSPS watch usually gives days of notice. Use them to move appointments, confirm the backup and charge equipment.
- The weather looks fine. A shutoff can come on a clear, dry, windy day, so staff and patients may not expect it. A short note in the reminder text helps.
- More than one person must get the alert. Register the office manager and the owner, and give the alert number to whoever opens the office.
- The outage can last longer than a storm outage. PG&E inspects lines before restoring power after a shutoff, so plan for the office being closed the next day as well.
- A valley office in the same group may be fine. If your group has a SMUD office in Elk Grove and a PG&E office in Auburn, forward the Auburn phones to Elk Grove for the day.
Groups with both kinds of office can find the per-office approach in the guide to multi-office dental IT from Davis to the foothills.
Which equipment in a Sacramento office needs battery backup, and which can shut down?
The server or NAS, the firewall, the network switch, the internet modem or fiber box and the phone system need battery backup, because they keep the office reachable and let the server shut down cleanly. Front-desk PCs benefit from a small UPS. Printers do not belong on a battery. Imaging hardware follows the maker's guidance.
Table F. Battery backup, device by device
| Device | On a UPS? | Why | Quarterly check |
|---|---|---|---|
| Server or NAS | Yes | Needs time to save and shut down cleanly when the battery runs low | Automatic shutdown setting tested; UPS self-test passed |
| Firewall | Yes | Without it, nothing reaches the internet, even if the modem is up | Plugged into a battery outlet, not a surge-only outlet |
| Network switch (PoE) | Yes | Powers internet phones and Wi-Fi access points | Load on the UPS checked after any new phones or access points |
| Internet modem or fiber box | Yes | The first thing lost when the power drops; with a battery, cloud tools and phones can keep working | Confirm with the carrier which box needs power; some fiber boxes have their own battery |
| Phone system controller | Yes | Keeps calls routing, including to forwarding numbers | Forwarding test call made |
| Front-desk PCs | A small UPS each, or at least one | Saves the open schedule and records instead of a hard power-off | Battery age on the label |
| Imaging acquisition PCs | Ask the vendor | Losing power mid-capture can mean a retake; follow the imaging maker's guidance | Vendor guidance kept on file |
| Panoramic and CBCT units | Follow the equipment maker's guidance | These are clinical devices with their own power requirements | Not an IT decision; ask the dealer |
| Printers | No | Laser printers draw heavy power and drain a battery fast | Make sure none is plugged into a UPS battery outlet |
| Wi-Fi access points | Through the PoE switch | They draw their power from the switch | Covered by the switch check |
This table gives no runtimes in minutes, because runtime depends on the battery, its age, the load and the temperature. Your installer sizes each unit. Run a battery test in early November, ahead of the first atmospheric river, and again in May, before the closet starts working against triple-digit afternoons.
After an outage, the urge is to flip everything off and on. The guide to restarting versus power cycling dental office equipment explains when each is right.
What if staff cannot reach the office when Highway 99 or a levee road closes?
Plan for a day when the building has power but the team cannot drive in, or the reverse. Over New Year's weekend 2022-23, flooding from levee failures on the Cosumnes River closed Highway 99 near Elk Grove. A practice that can run scheduling, insurance follow-up and patient calls from home, with forwarded phones, keeps working that day.
Sacramento's flood geography makes this more than a hypothetical. Highway 99 is a commuter route for staff living in Galt and the south county. Natomas moved to FEMA A99 status in June 2015. The City of Sacramento said building permits could resume from that date, and that owners with federally backed mortgages still need flood insurance until the Natomas levees are certified. Levee roads and low crossings close in heavy rain.
The remote day works if four things are in place before the season:
- Remote access to the practice-management software with multi-factor authentication for the front desk and billing staff. Test it from a home computer in November, not on the storm day.
- Call forwarding from the main number to a staff mobile or to another office, with the steps written down. If you are moving or upgrading phones, the dental VoIP phone service page covers how call routing can be set up.
- A patient-call plan. Decide who calls the day's patients, from which list, and what they say.
- Clear limits. Clinical work stays in the office. The remote day is for rescheduling, insurance follow-up, claims and patient messages.
If you are planning a new office in Natomas or another growth area, plan the closet height and location from day one; the guide to new-construction dental office IT in Elk Grove, Folsom or Roseville covers siting.
The remote-access setup is also where a provider's support model shows. The guide on when remote dental IT support is enough and when someone should come onsite explains the trade-off.
What if the internet goes down in a valley storm but the lights stay on?
Add a backup connection before the storm season: a line from a second carrier that reaches the building by its own route, or a router with a cellular modem that switches over by itself. A falling limb can take down a carrier's line on a street where SMUD power stays on, and the backup keeps the front desk, phones and cloud tools working.
Choosing between the two:
| Option | Good for | Watch for |
|---|---|---|
| A second wired carrier (a different company, entering the building by a different route) | Imaging uploads, cloud backups and heavier traffic during an outage of the main line | Some buildings have only one carrier at the street; confirm the second line truly takes a different path |
| Cellular failover (a router with a cellular modem) | Phones, the schedule, email, card payments and cloud practice software | Large imaging uploads and offsite backups may need to wait for the main line |
Decide in advance which tasks will run on the backup line and which will pause. Your firewall can be set to fail over automatically. If the line has already dropped, the first-hour guide for a dental office with no internet sets out who checks what.
Where should a Sacramento practice keep its offsite backup?
Keep at least one copy of the practice's data outside the building, and outside the same flood basin and power grid. A backup drive in the same closet, or at the owner's house two miles away on the same SMUD circuit, can be lost to the same storm. Then prove the copy works by restoring it on a schedule.
In practice, that means:
- One local copy (on the NAS or a backup appliance) for fast restores after a hardware fault.
- One offsite copy in a cloud or data-center location well away from the Sacramento Valley.
- A restore test at least twice a year, timed so you know how long getting the practice-management database and imaging archive back takes.
- A log of each test: the date, what was restored and who checked it.
Legend lists backup protection from $39.99 per month (storage-dependent) on its dental backup and recovery services page. The national dental backup and disaster recovery checklist lists every check, and a written dental disaster recovery plan ties them to roles and recovery times.
When SMUD or PG&E restores power, what comes back first?
Wait until the power has been stable for about 15 minutes, start the closet cooling, then bring up the network before the server, the server before the workstations, and the phones and imaging after the practice-management software works. Starting everything at once can leave PCs unable to find the server and the database in a bad state.
Table E. The reopening order
| Step | What | Check before moving on |
|---|---|---|
| 1 | Power stable for about 15 minutes | No flicker; the utility shows the outage as restored for your address |
| 2 | Closet cooling on | Air moving; the closet starting to cool |
| 3 | Internet modem or fiber box, then the firewall | Internet lights steady; a test website loads |
| 4 | Network switch and Wi-Fi | Phones and access points powering up |
| 5 | Server or NAS | Fully started; no disk or database warnings |
| 6 | Practice-management software | It opens on one workstation; today's schedule is there |
| 7 | Front-desk PCs | Each can open the schedule and a patient chart |
| 8 | Imaging PCs and sensors | A test capture saves to the right chart |
| 9 | Phones | Forwarding removed; a test call in and out works |
| 10 | Backups | The next scheduled backup runs; check it the following morning |
| 11 | Incident note | Write down when power went, what failed, what worked and what to change |
If something does not come back at any step, stop there and call for help. Legend's helpdesk is staffed 24/7 at 1-800-794-1588. Write the number on the reopening card next to Table E.
The incident note is the step most offices skip and the one that improves the next plan. After the January 2023 storm series, an office that wrote down its first outage would have known what to fix before the second.
Where does Legend fit in a Sacramento power plan?
Legend Networking supports dental offices across the country remotely from its Dallas headquarters, and the tables in this guide describe the kind of work involved: battery and shutdown settings, closet alerts, remote access, failover and tested backups. Legend has served over 3,500 practices since 2004 and holds a 4.8 rating · 173 Google reviews.
The support model, in the registry's words: in-house engineers; no outsourced first-level triage. Onsite dispatch by appointment across served dental markets; remote-first nationwide. Day-to-day software and support issues are handled remotely; cabling, installations, equipment moves and new-office build-outs are scheduled onsite by appointment. Ian Lynch has 22 years in dental IT and oversees the NOC, onsite dispatch and client technology roadmaps.
For the wider picture of what a dental provider handles, Legend's dental IT support page sets out the scope. If you are comparing providers, the list of the best dental IT companies explains what to look for. For offices from Midtown to Rocklin, the page on IT support for dental offices in Sacramento covers how support begins, and owners south of the city can read about dental IT support in Elk Grove on the same page.
What to ask your IT provider
Bring these questions to your next review, and ask for the answers in writing:
- Which utility is each of our offices on, and is that written in our plan?
- What does our server closet reach on a hot weekend, and who gets the temperature alert?
- When was each UPS battery last tested, and is the server set to shut down automatically?
- Is the internet modem or fiber box on a battery?
- Can the front desk work from home with multi-factor authentication, and when did we last test it?
- Does any copy of our data sit outside the Sacramento Valley, and on what date did someone last restore from it?
- If a storm takes our main line, which backup connection takes over, and what pauses until the line is back?
- Who forwards the phones, and to which number?
Key takeaways
- A Sacramento dental office plans for two seasons: wind and rain from November to March and heat from June to September.
- The utility on your bill (SMUD, Roseville Electric or PG&E) decides which outage pattern and which alerts apply.
- SMUD's territory is outside the high-fire-threat designation, so valley outages have mostly come from windstorms, not wildfire shutoffs.
- A small closet can give off about 2,150 BTU per hour; on a hot weekend with cooling set back, that heat has nowhere to go.
- Put the server, firewall, switch, modem and phone system on battery with an automatic shutdown, and keep a tested backup outside the valley, a backup internet connection and written call-forwarding steps.
- Bring the office back in order: power, cooling, network, server, software, PCs, imaging, phones, backups.
Sources
- SMUD, 2023 year in review, on the storms from 31 December 2022 (accessed 2026-11-24).
- SMUD, release of 3 January 2023, on the New Year's Eve storm (accessed 2026-11-24).
- SMUD, release of 4 February 2024, on the 65+ mph windstorm (accessed 2026-11-24).
- The Sacramento Bee via AOL, 6 September 2022, on the 116°F record and SMUD's conservation call (accessed 2026-11-24).
- CBS Sacramento, 24 September 2024, on the record for triple-digit days (accessed 2026-11-24).
- SMUD, wildfire page (accessed 2026-11-24).
- City of Roseville, Roseville Electric "About us" (accessed 2026-11-24).
- The Sacramento Bee via AOL, on PG&E service in Placer County communities (accessed 2026-11-24).
- PG&E newsroom, September 2026 PSPS watch (accessed 2026-11-24).
- Cal OES, 2 January 2023, on the Cosumnes River levee failures near Wilton (accessed 2026-11-24).
- ABC30, 2 January 2023, on the Highway 99 flood closure in Elk Grove (accessed 2026-11-24).
- City of Sacramento, City Express, 16 June 2015, on the Natomas flood zone status (accessed 2026-11-24).
- CBS Sacramento, on the city's tree canopy plan (accessed 2026-11-24).
- TechTarget, summary of ASHRAE's 2021 Equipment Thermal Guidelines for Data Processing Environments (accessed 2026-11-24).
Frequently asked questions
Does Roseville Electric's mostly underground network mean a Roseville dental office can skip battery backup?
No. The City of Roseville says 86% of its electric infrastructure is underground, which keeps most lines away from falling limbs. An office can still lose power to an equipment fault or a regional grid emergency, and its internet carrier can fail on its own. Keep the server, firewall, switch, modem and phone system on battery with an automatic shutdown.
Can SMUD shut off power for wildfire risk the way PG&E does?
SMUD says Sacramento County is not designated a high fire threat area, and that it may turn off power only as a last resort to protect public safety. Its biggest wildfire risk is around its hydroelectric facilities in El Dorado County. For a valley office on SMUD, windstorms and heat-wave grid stress are the events to plan around, while PG&E's shutoff program mainly affects foothill communities.
How should a dental office use the last half hour of the day when a wind warning is issued for the Sacramento Valley?
Confirm last night's backup completed and that the UPS shows charged with no alarm. Print or export the next two days' schedule with phone numbers, post the call-forwarding steps, and charge laptops and phones. Decide who opens and who calls patients if you stay closed, and lift anything off the closet floor.
Why does a dental server closet overheat on a Sacramento weekend when the office is closed?
The server, switch, firewall and backup device keep running, and nearly all the power they draw becomes heat. A closet drawing 630 W gives off about 2,150 BTU per hour. Many buildings set the air conditioning back on Saturday and Sunday, so in a 100°F week that heat has nowhere to go. A dedicated cooling unit and a temperature alert to two people fix it.
What should we do if SMUD or the state grid asks customers to conserve power on a heat-wave afternoon?
Keep the server, network and phones running, and leave the closet cooling on. Move long imaging sessions earlier in the day, ask the front desk to save open records before late afternoon, and check that the UPS is charged. Save power with lights and non-clinical equipment instead. A conservation call is a request, not an outage.
Why do Sacramento storms tend to come in series, and what should the office check between them?
The 2022-23 storms ran for about three weeks, according to SMUD, so one outage was often followed by another within days. Between storms, check that each UPS has recharged and is not alarming, that the overnight backup ran, and that the call-forwarding card is still at the front desk. Write a short note on what failed in the last outage and fix it first.
Should an El Dorado Hills or Auburn office sign up for PG&E shutoff alerts even if the main office is on SMUD?
Yes. Alerts follow the address and the utility, so each office on PG&E needs its own registration with more than one recipient, usually the office manager and the owner. In September 2026, PG&E sent notices about two to three days ahead of a possible shutoff. That is enough time to move appointments, confirm the backup and charge equipment.
What if staff cannot reach the office because Highway 99 or a levee road is closed?
Run a remote day. Front-desk and billing staff log in from home with multi-factor authentication, the main number forwards to a staff mobile or another office, and one person calls the day's patients. Over New Year's weekend 2022-23, flooding from Cosumnes River levee failures closed Highway 99 near Elk Grove, so test this setup each November.
Should the closet cooling come back on before the server after a long SMUD outage?
Yes. Once power has been steady for about 15 minutes, start the closet cooling first, because a closet that sat without air in summer heat can already be hot. Then bring up the modem and firewall, the switch and the server, and open the practice-management software on one workstation before the rest of the office.
The bottom line
A plan is easier to trust when someone has looked at your own closet, batteries, internet and backup. Ask for a Free Dental IT Assessment with Tables A, B and F in hand, whether your office is in Midtown, Elk Grove, Roseville or the foothills. Legend's dental IT support page explains what ongoing support covers.