Brick Walls, Basements and Converted Storefronts: IT for Dental Offices in Older St. Louis Buildings
The broker unlocks a two-storey brick building on a corner in Webster Groves. You see four operatories where the front parlour and dining room used to be. Your IT person sees a stone foundation, plaster walls with no space behind them, a fuse panel in the basement and a water line on the basement wall at knee height.
Support for the practice after you move in is a separate subject, covered on Legend's page about dental IT support in St. Louis. This post is about the building. It is written for an owner or a new owner looking at a converted house, a storefront, a two-flat or an older medical building, anywhere from South City and Maplewood to Kirkwood, Belleville and Alton. The wider St. Louis dental IT guide covers utilities, weather and support across the metro. Nothing here is electrical, structural, legal or environmental advice: those calls belong to your contractor, electrician and the local building office.
Before you lease or buy an older St. Louis building, check five things: where cable can run without opening every wall, how many Wi-Fi access points the brick and plaster will need, whether the electrical service can carry imaging and a server rack, whether an asbestos inspection comes first, and where the server can sit above flood level.
- Brookings found that 59% of the City of St. Louis's buildings were built before 1939, so brick walls, plaster, basements and small electrical services are common in dental offices here.
- Walk the building with a room-by-room survey sheet before you sign: internet entry, basement water marks, the panel label, walls, ceilings, a main-floor closet and existing cabling.
- Plan Wi-Fi by room: in brick or plaster, roughly one ceiling access point per two operatories, plus the front office and each other floor.
- After the July 26, 2022 flood, keep the server and backup drive on the main floor or above; the basement holds cable paths only.
- Ask the contractor about an asbestos inspection and which office issues the permit (the City, St. Louis County, your municipality or an Illinois town) before the cabling quote.
In this guide
- What makes an older St. Louis building hard to fit with dental technology?
- What should you check on a walk-through of a South City or Webster Groves building before you sign?
- Which cable paths work in a brick two-flat or converted storefront?
- How many Wi-Fi access points does a brick-and-plaster dental office in St. Louis need?
- Basement, ground floor or upstairs: where should the server live after the July 2022 flood?
- Does a Missouri or Metro East office need an asbestos check before cabling?
- Which office issues your remodel permit: the City, St. Louis County, your municipality or an Illinois town?
- How would five operatories fit into a 1920s brick two-flat? A worked example
- What did the last tenant leave in the walls of a Kirkwood or Florissant office?
- How do you keep a closet in an old building cool, dry and clean during renovation?
- What should you ask your IT provider before signing a lease on an older St. Louis building?
- Frequently asked questions
- The bottom line
What makes an older St. Louis building hard to fit with dental technology?
Older St. Louis buildings put four limits on dental technology: solid walls that stop Wi-Fi and hide no cable space, few paths for new cable, electrical services sized for a house or a shop, and basements that take water first. The age of the building stock makes these common here: Brookings found that 59% of the city's buildings were built before 1939.
The same Brookings analysis, published on March 26, 2025, puts the downtown share at 53%. Inner-ring suburbs such as Webster Groves, Kirkwood, Maplewood and University City, and Metro East towns such as Belleville and Alton, add many more pre-war buildings. Dentists choose them for good reasons: a street front patients can find, parking behind, character, and a price below new construction. The technology problems come with the walls.
The building types you are likely to walk through
| Building type | Where you see it | What it does to the IT plan |
|---|---|---|
| Brick two-flat or four-family converted to an office | South City, Tower Grove, Dutchtown, parts of University City | Interior bearing walls of brick; plaster on lath upstairs; a full basement with the panel and the water heater; Wi-Fi stops at every wall |
| Commercial storefront with a tin or plaster ceiling | Cherokee Street, Maplewood's Manchester Road, Main Street in Belleville | One long room; the ceiling may be worth keeping, so cable cannot simply go up; the internet often enters at the back alley |
| Pre-war house converted to a practice | Webster Groves, Kirkwood, Ferguson, Edwardsville | Many small rooms, stairs, an attic and a basement; more walls between the front desk and the last operatory than you expect |
| 1960s to 1980s medical or office building | Creve Coeur, Clayton, Florissant, Ballwin | Drop ceilings make cabling easier, but closets and risers may be shared with other tenants and controlled by the landlord |
| Downtown commercial block, two or three storeys | Belleville, Alton, St. Charles's Main Street | Thick masonry, upper floors reached by one stair, and old service entrances shared with neighbours |
The four limits
- Walls. Solid brick, block and plaster on metal or wood lath absorb or reflect radio signal, and there is no hollow cavity to fish a cable through.
- Paths. New cable needs a route: up from a basement or crawlspace, down from an attic, or along the surface. Each building offers a different mix.
- Power. A service sized for a family home or a corner shop may not carry a panoramic or CBCT unit, a compressor, a vacuum pump, a server rack and several operatories at once. Only a licensed electrician can tell you.
- Water. In most older St. Louis buildings, the panel, the internet entry and the obvious "spare room" for equipment are all in the basement.
What should you check on a walk-through of a South City or Webster Groves building before you sign?
Walk the building room by room with a written sheet, and do it before the lease or purchase is signed. Note where the internet enters, what the basement shows about water, what the electrical panel label says, what the walls and ceilings are made of, where a main-floor closet could go and what cabling is already there. Ask the seller or landlord in writing about flooding and asbestos.
Take this sheet, a flashlight and a phone camera. Photograph every item so your IT provider, contractor and electrician can review the same evidence.
The older-building survey sheet
Street side and entry
- [ ] Where does the internet cable or fibre enter the building? Front, alley, side wall or basement?
- [ ] Is there an existing demarcation point (the carrier's box), and which carrier's name is on it?
- [ ] Ask the landlord which carriers have served the building. Your IT provider checks availability for the address; do not rely on a neighbour's service.
- [ ] Is the building in a historic district? If so, exterior changes such as antennas, satellite dishes or new signage may need review. Ask the city.
Basement or crawlspace
- [ ] Water marks, stains or efflorescence (white mineral deposits) on walls; their height from the floor.
- [ ] Is there a sump pump? Does it have a battery backup or an alarm?
- [ ] Floor drains, and whether they look clear.
- [ ] A dehumidifier already running is a clue that the space is damp.
- [ ] Height of the electrical panel and the water heater above the floor.
- [ ] Ask the seller or landlord, in writing, whether the basement has flooded, when, and what was replaced.
Electrical panel
- [ ] Photograph the label: main breaker amperage, panel make and any date.
- [ ] Count free breaker spaces.
- [ ] Fuses instead of breakers, or a panel that looks decades old, go straight to the electrician's list.
- [ ] Write down the planned load for the electrician: imaging units, compressor, vacuum, operatory chairs, a server rack and battery backup.
Walls and ceilings, by room
- [ ] Brick, block, plaster on lath or drywall? Knock and look at outlet boxes.
- [ ] Ceilings: drop ceiling, plaster, or a tin or decorative ceiling the landlord or you will want to keep.
- [ ] Existing chases: old heating ducts, plumbing walls, closets stacked floor over floor.
Floors
- [ ] Is there a basement or crawlspace under each planned operatory? If so, cable may come up through the floor, which your contractor confirms.
- [ ] Hardwood or tile that cannot be disturbed.
Closets
- [ ] A candidate network closet on the main floor, away from plumbing, with room for a small rack, a door that locks and a way to ventilate it.
Existing cabling and equipment
- [ ] Category marking printed on any network cable you can see (for example "Cat 5e" or "Cat 6").
- [ ] Labels on wall jacks, and where the cables end up: a patch panel, a closet shelf or a basement beam.
- [ ] Any documentation the previous tenant's installer left.
- [ ] Old phone wiring, alarm panels and abandoned equipment.
Ask for
- [ ] Any asbestos inspection report for the building (see the asbestos section below).
- [ ] The landlord's rules on drilling, surface raceway and roof or exterior work.
Once the sheet is filled in, it is a good moment to ask for a Free Dental IT Assessment; bring the photos with you.
Which cable paths work in a brick two-flat or converted storefront?
Most older St. Louis offices are cabled from below, from above or along the surface, and rarely through solid walls. A basement or crawlspace under the operatories lets cable rise through the floor; an attic lets it drop down interior partitions; painted surface raceway covers the gaps. Your contractor decides which paths are allowed, and every run is labelled at both ends.
From below. In a two-flat or a pre-war house with a full basement, the cleanest route is usually across the basement ceiling joists and up into each room through the floor or the bottom of a partition. This is the most common answer in South City and inner-ring suburbs, and it is why the basement matters even when no equipment lives there.
From above. Where an attic sits over the main working floor, cable can drop down through interior walls that are framed rather than brick. In a storefront with a ceiling to preserve, the route may be the space above a new soffit or bulkhead built along one wall.
Along the surface. Surface raceway, painted to match the wall, is a respectable answer in a building with solid masonry. It is quicker to install, it keeps plaster intact, and it can be removed when you leave.
Through existing chases. Old heating ducts, plumbing walls and disused chimney flues sometimes offer a vertical path. Use them only where your contractor approves; some carry fire, gas or code concerns that only a contractor and the building office can judge.
How many drops each room needs
A drop is one network cable from the closet to one wall jack. Plan by what each room does:
| Room | Typical drops | Why |
|---|---|---|
| Operatory | 3 | Workstation, imaging device or sensor hub, and a wired phone or a spare |
| Front desk (per two positions) | 4 | Two computers, a printer or card terminal, a phone |
| Doctor's office | 2 | Computer and a spare |
| Panoramic or CBCT room | 2 | The unit's acquisition computer and the unit itself, as the vendor specifies |
| Ceiling, per access point | 1 | Each Wi-Fi access point runs on one cable |
| Spares | 10–20% of the total | Old buildings are expensive to re-enter, so pull spares while the path is open |
Label every cable at both ends and keep a floor plan showing each jack. The next time someone needs to trace a fault, a labelled drawing saves an afternoon of guessing in a basement. For a broader view of closet layout, cable types and testing, see Legend's network design page; if you are planning a full fit-out, the build-outs page sets out how new-office technology is approached. Major cabling projects are quoted separately from ongoing support.
How many Wi-Fi access points does a brick-and-plaster dental office in St. Louis need?
Plan Wi-Fi by room, not by square footage. In a brick or plaster building, expect roughly one ceiling-mounted access point for every two operatories, plus one for the front office and one for each other floor in use. A single router in the front office will not reach the back operatories through two masonry walls, however strong it claims to be.
Brick, block and plaster on metal lath block or soak up the radio signal that Wi-Fi uses. A wood-framed suburban office with drywall lets the signal pass through several walls; a 1920s two-flat stops it at almost every one. That is why staff in older buildings report Wi-Fi that works at the front desk and drops in Operatory 4.
How to plan it
- Mount access points on ceilings, inside the rooms that need them, and power each one over its network cable (Power over Ethernet) from the switch in the closet. That avoids an outlet at every ceiling.
- Keep separate wireless networks for staff devices, imaging devices that need wireless, and guests. The guest network should never reach the practice software.
- Wire whatever can be wired. Workstations, imaging computers and the server belong on cable. Wi-Fi is for tablets, laptops and phones.
- Ask for a coverage check after installation, room by room, with the doors closed.
If you are already in an older building and the signal keeps failing, the troubleshooting steps in dental office Wi-Fi keeps dropping will help you find the cause before you buy anything.
Basement, ground floor or upstairs: where should the server live after the July 2022 flood?
Keep the server and network closet on the main floor or higher, never on a basement floor. The flash flood of July 26, 2022 put 8.64 inches of rain on the airport gauge at Lambert in one day, the most the station has ever logged, and water came into homes and businesses from Florissant to Belleville. In an older building, the basement is where water arrives first, and so does any equipment stored there.
The National Weather Service's record of that day lists flooded streets and buildings in Webster Groves, Brentwood, University City, Florissant, O'Fallon, Missouri, and along Richland Creek in Belleville. Washington University's St. Louis Floods project, writing about the flood along the River Des Peres, counts more than 300 condemned homes in University City alone and more than $30 million in damage. None of those places is unusual for a dental office. Many of them are exactly where the converted houses and storefronts on your shortlist sit.
Server placement in an older building
| Location | Flood risk | Heat and humidity | Security | Cable reach | Verdict |
|---|---|---|---|---|---|
| Basement | Highest; water, sewer backup and sump failure all reach it first | Damp all summer; needs a dehumidifier | Often unlocked, shared with utilities | Good; cable runs are short to the joists | Cable paths only. No server, switch or backup drive on this level |
| Ground-floor (main-floor) closet | Low unless the building has a history of first-floor water | Manageable with a vent or a small cooling unit | Lockable | Good; central to operatories | Preferred in most two-flats and storefronts |
| Upper-floor closet | Lowest | Hottest in summer; attic heat builds up | Lockable; away from patients | Longer runs down to the main floor | Good if cooling is planned and cable can drop cleanly |
| Under the front desk | Low | Poor airflow; dust and feet | Exposed to anyone at the desk | Short | No. Spilled coffee and a kicked plug take the office down |
| No local server (cloud practice software, with a small local device for imaging files) | Depends where the local device sits | Small heat load | Smaller target in the building | Fewer cables to one place | Reasonable where your software supports it; the imaging device still follows the main-floor rule |
Turning the July 2022 flood into a placement plan
- Put the closet on the main floor or above, and mount the rack or cabinet off the floor so a small leak does not reach it.
- Leave only cable paths in the basement. If cables must enter the building there, have the junction mounted high on the wall, above any water line you photographed.
- Never keep the backup drive beside the server. A local copy upstairs or in another room helps with quick restores; a copy outside the building protects you from the event that took both.
- Keep an offsite copy, and test a restore. An untested backup is a hope. Legend's backup and recovery service describes the approach; backup protection from $39.99 per month (storage-dependent).
- Check the sump pump plan. A sump pump on the same circuit as everything else stops when the power does, which is often when the rain is heaviest. Your plumber or electrician advises on a battery backup for it.
- Write the water history into the lease file. If the seller or landlord says the basement has never flooded, have that in writing.
Water is one way an old building fails. Wind damage is the other risk: at least 4,400 buildings were damaged by the EF3 tornado that started in Clayton on May 16, 2025. What to do when the building itself is damaged is covered in the tornado recovery plan for St. Louis dental offices.
Does a Missouri or Metro East office need an asbestos check before cabling?
Ask before anyone drills. Missouri's Department of Natural Resources publishes rules that call for public and commercial buildings to be inspected by a Missouri-certified asbestos inspector before renovation or demolition work. Your contractor confirms whether your cabling or remodel counts, and you should have the report in hand before anyone opens old ceilings, plaster or floor tile.
Why this matters to IT: older ceilings, plaster, pipe wrap and some floor tiles in buildings of this age can contain asbestos. If the inspection finds material that should not be disturbed, the cable paths change. A route across a basement ceiling might be ruled out; surface raceway might replace a run through plaster. That is why the survey and the inspection should come before the cabling quote, so the quote reflects the paths that are actually allowed.
- City of St. Louis: asbestos project notifications run through the city's Building Division, with the city's own process.
- St. Louis County and St. Charles County: your contractor confirms which office handles notifications for your address.
- Illinois side (Belleville, Edwardsville, O'Fallon, Illinois, Alton, Collinsville): ask the local building department, and your contractor will know whether the Illinois EPA's rules apply to the work.
This is a pointer, not a reading of the rules. Thresholds, fees and notice periods are for the contractor and the regulator to confirm; the Missouri DNR publishes its current requirements on its own site.
Which office issues your remodel permit: the City, St. Louis County, your municipality or an Illinois town?
It depends on the address. The City of St. Louis runs its own Building Division. Across St. Louis County, a municipality may hand its building or electrical permits to the County or keep its own department. St. Charles County cities and Illinois towns run their own. Your contractor confirms which office issues yours and whether low-voltage cabling needs its own permit.
This fragmentation is a St. Louis quirk. A practice moving from Kirkwood to Creve Coeur, or from Maplewood to Belleville, may deal with a different building office, a different inspector and different paperwork, even though the drive is short. St. Louis County publishes a matrix showing which municipalities contract with it for which services; the contractor uses that to confirm.
What IT needs from the permit process
- The approved floor plan, so cable runs and the closet match what was permitted.
- The electrician's plan for dedicated circuits (the closet, imaging units, the server), so the IT provider can size battery backup to match.
- The inspection dates, because cabling usually goes in before walls or ceilings are closed and inspected.
- Any condition from the building office that affects the closet: fire separation, a door rating or ventilation.
No permit timeline is given here, because each office sets its own. Build the IT schedule around the dates your contractor gets in writing.
How would five operatories fit into a 1920s brick two-flat? A worked example
Here is an example plan, with illustrative numbers, for a five-operatory practice in a two-storey 1920s brick two-flat with a full basement. It comes to 30 cable drops, 5 Wi-Fi access points, a vented main-floor closet on a dedicated circuit, battery backup on the core equipment and a basement used only for cable paths. Your building's numbers will differ, but the reasoning carries over.
The building (example): two floors and a basement. Brick exterior and interior bearing walls; plaster on lath upstairs. The five operatories and the front desk are on the main floor, with a small imaging room in what was the back porch. The doctor's office, break room and storage are upstairs. The panel, water heater and internet entry are in the basement, which shows an old water line about 12 inches up the wall.
Drops (example)
| Item | Count | Why |
|---|---|---|
| Operatories (5 × 3) | 15 | Workstation, imaging device, phone or spare in each |
| Front desk | 4 | Two check-in and check-out computers, printer, phone |
| Doctor's office (upstairs) | 2 | Computer and spare |
| Imaging room | 2 | Acquisition computer and the unit, per the vendor |
| Printers and card terminal | 2 | Shared printer and a wired payment terminal |
| Spares | 5 | Pulled while the paths are open |
| Total | 30 |
The 5 access points are fed from the same switch, on their own cables beyond these 30.
Access points (example)
| Location | Count | Why |
|---|---|---|
| Main-floor operatories | 3 | One per two rooms; brick walls between pairs of operatories |
| Front office and waiting room | 1 | Staff tablets and a separate guest network |
| Upstairs | 1 | Plaster on lath and a stairwell between floors |
| Total | 5 |
Five is not a rule. A storefront with one long open room might need three; a converted house with many small rooms might need six. The count follows the walls.
The closet and the basement (example)
- Closet: the former pantry on the main floor, central to the operatories. A louvred door or a small exhaust fan for airflow, a lockable door, a wall-mounted rack off the floor, and a dedicated circuit that the electrician confirms.
- Basement: cable runs along the joists and a junction box mounted high on the wall near the internet entry, well above the old water line. Nothing with a power cord stays on the floor.
- Cable path upstairs: a disused chase beside the old chimney, only because the contractor approved it; otherwise surface raceway in the stairwell.
Battery backup (example)
Put these on a UPS (uninterruptible power supply) in the closet: the server or storage device, the firewall, the switch, the internet modem or fibre terminal, and the phone system controller. The imaging computers get their own small units so they can shut down in order. Laser printers do not go on a UPS. The installer sizes each unit from the actual equipment, and the IT provider sets the server to shut down cleanly when the battery runs low. No runtime is promised here, because it depends on the load.
Backup (example)
A local copy on a device upstairs, away from the closet, for quick restores; and an encrypted copy outside the building, tested by restoring files and a database copy each quarter.
What changes in a CBCT room
A CBCT unit brings large files, a dedicated acquisition computer and the vendor's own power and network requirements. In an older building, confirm the room's electrical capacity and the cable route back to the closet early, before the room is framed. The computer and network side is covered in CBCT computer and network requirements. A periodontist or endodontist planning a first office around a scanner has a separate guide: specialty dental practice startup IT in St. Louis.
If you would like your own floor plan run through the same exercise, you can request a Free Dental IT Assessment, and send the walk-through photos ahead.
What did the last tenant leave in the walls of a Kirkwood or Florissant office?
Usually a mix of useful cable and hidden liabilities. In an older St. Louis building, a retiring dentist or the tenant before them may have left documented network runs worth keeping, alongside abandoned phone wire, a server on a basement shelf and an unvented closet. Sort what the building itself holds before you look at the computers and software.
Taking over a second-generation office in Kirkwood, Florissant, Ballwin or Belleville is a common route into ownership. The equipment and handover side (computers, sensors, licences, the seller's IT provider) is covered in the dental practice acquisition IT due diligence checklist, and a full takeover walk-through for a different market is in taking over a second-generation dental office in Fort Myers. The list below covers only what an older building tends to hide.
Left in the building: what to look for
| What was left | Where to look in an older building | A sign it is usable | A sign it is a liability |
|---|---|---|---|
| Network cable runs | Basement joists, wall jacks, a patch panel | Category printed on the jacket, labelled at both ends, tests clean on a certifier | Unlabelled, spliced, stapled to joists, or ending in a loose bundle |
| A server in the basement | Shelves near the panel or the water heater | Nothing on it you need | Patient data still on it with no copy elsewhere, or on the floor near a water line |
| Old phone and alarm wiring | Basement entry, the front closet | Removed or clearly marked as dead | Mixed in with network cable so nobody knows which is live |
| The previous network closet | A coat closet, a stair cupboard, a basement corner | Vented, lockable, above any water line, on its own circuit | Hot, damp, unlocked, or sharing a room with plumbing |
| Extension cords and power strips feeding equipment | Behind the front desk, in the closet | None | Daisy-chained strips; ask the electrician to look |
| Sump pump and dehumidifier | Basement | Working, with an alarm or battery backup | Absent in a basement with water marks |
| A carrier's box and old account | The internet entry | The landlord or seller can name the carrier and account holder | No one knows who owns the account or the line |
Two rules for anything old with data on it. First, treat any server or storage device in the building as holding patient records until proven otherwise; old records have to be kept and protected, and some practices keep the old server for exactly that reason. Second, never power on equipment that has sat in a damp basement without a check by your IT provider. Moving records to a safe place is part of the move plan in the dental office relocation IT checklist, which covers the timing of the switch from the old office to the new one.
How do you keep a closet in an old building cool, dry and clean during renovation?
Give the closet airflow, keep humidity down and seal the equipment from dust while work is going on. St. Louis summers are hot and humid, older buildings often lack central air in closets and basements, and renovation dust gets into fans and switches. Ventilation, a dehumidifier where needed, and covering or moving equipment during work cover most of the risk.
- Airflow. A closed closet with a server, a firewall, switches and battery backup produces steady heat. A louvred door or a small exhaust fan is often enough; a small dedicated cooling unit is an HVAC contractor's call.
- Humidity. Damp air corrodes connectors over time. If the closet adjoins a basement stair or an exterior brick wall, a dehumidifier in the space outside it helps. Never run a dehumidifier's drain hose near equipment.
- Temperature watching. Check the equipment's stated operating range on its spec sheet, and ask your IT provider whether the devices can report their own temperature.
- Dust during renovation. Plaster and brick dust is fine and gets everywhere. Before drywall, sanding or demolition starts near the closet, have the IT provider shut down and cover the equipment or move it, and clean filters and fans afterwards.
- Out of the way of water. Not under a bathroom, not beside the water heater, and not against a wall that showed damp on the survey.
What should you ask your IT provider before signing a lease on an older St. Louis building?
Ask whether they will review the survey sheet and photos before you sign, where they would put the closet, how cable will reach each room, how many access points they expect, what battery backup the closet needs and how the server stays above water. Get the answers in writing, alongside the contractor's and electrician's.
- Will you review the walk-through photos and the survey sheet before I sign the lease or the purchase?
- Where would you put the network closet in this building, and why not the basement?
- Which cable paths do you expect to use (from below, from above, surface raceway), and what do you need my contractor to confirm?
- How many Wi-Fi access points do you expect, and how will you check coverage after installation?
- What equipment goes on battery backup, and who sizes it against the electrician's circuits?
- Where will the local and offsite backup copies live, and when will we first test a restore?
These questions apply whether the building is a two-flat in South City or a 1960s medical building where the landlord controls the riser closet. For a practice in that second kind of building, Legend's page on dental IT support in Clayton and the wider metro sets out what ongoing support looks like.
Where Legend fits. Legend Networking has 22+ years in dental IT (since 2004) and has served over 3,500 practices since 2004, with a 4.8 rating · 173 Google reviews. Legend publishes "In-house engineers; no outsourced first-level triage" and "Onsite dispatch by appointment across served dental markets; remote-first nationwide." Day-to-day software and support issues are handled remotely; cabling, installations, equipment moves and new-office build-outs are scheduled onsite by appointment. Hardware procurement, major cabling projects and software licensing are quoted separately. Ian Lynch, the author of this post, oversees Legend's NOC, onsite dispatch and client technology roadmaps after 22 years in dental IT. If a question comes up while you are weighing a building, the helpdesk is staffed 24/7 at 1-800-794-1588, and 24/7 monitoring runs on the systems of practices Legend supports. For what ongoing dental IT support covers nationally, or the scope of IT support for dental offices in St. Louis, those pages set it out.
Frequently asked questions
Can you run modern dental cabling in a 1920s St. Louis building without opening every wall?
Usually, yes. Most older St. Louis offices are cabled from a basement or crawlspace up through the floor, from an attic down through framed partitions, or along painted surface raceway. Solid brick walls are avoided rather than cut. Your contractor decides which paths are allowed, an asbestos check may come first, and every run should be labelled at both ends.
Why does Wi-Fi struggle in brick buildings, and how many access points does an office need?
Brick, block and plaster on metal lath absorb or reflect the radio signal Wi-Fi uses, so one router rarely reaches past two masonry walls. Plan by room: in a brick or plaster building, expect about one ceiling-mounted access point per two operatories, plus one for the front office and one per other floor in use, all wired back to the closet.
Is a basement a safe place for the dental server?
No. In an older building the basement is the first place water reaches, whether from heavy rain, a sewer backup or a failed sump pump, as the July 26, 2022 flood showed across St. Louis. Keep the server, switch and backup drive on the main floor or above, mounted off the floor, and use the basement only for cable paths.
How many network drops does a dental office in an older building need?
Count by room rather than by square foot. A common plan is three drops per operatory, four for a two-person front desk, two for the doctor's office and two for an imaging room, plus one per ceiling access point and 10 to 20% spares. In an older building, pull the spares while the path is open, because re-entering plaster or a basement ceiling later costs more.
Will an older building's electrical service handle a CBCT, a server rack and new operatories?
Only a licensed electrician can say. Many older St. Louis buildings have services sized for a home or a shop. Photograph the panel label, count free breaker spaces and give the electrician a list of planned loads: imaging units, compressor, vacuum, chairs, the server rack and battery backup. Ask for dedicated circuits for the closet and the imaging room.
What should we check in a second-generation office before we sign the lease?
Walk it room by room with a written sheet. Note where the internet enters, water marks and the sump pump in the basement, the electrical panel label, wall and ceiling materials, a main-floor closet location and any existing cabling and its labels. Ask the landlord or seller in writing about past flooding and any asbestos inspection report, and have your IT provider review the photos.
What if the internet line enters an older building through the basement?
That is common in South City two-flats and pre-war houses, and it is workable. Have the carrier's line end at a junction mounted high on the basement wall, above any water line, and run it up to a network closet on the main floor. Keep the modem, firewall and switch out of the basement, and photograph the entry point for your IT provider before you sign.
Can we reuse the previous dentist's cabling and network closet?
Often the cabling, if it is labelled, documented and tests clean on a certifier, and if its category suits current equipment. The closet is reusable only if it is vented, lockable, on its own circuit and above any water line. Unlabelled or spliced runs, and a closet in the basement or beside plumbing, are better replaced or moved before opening.
How do we protect equipment from heat and humidity in an older building's closet?
Give the closet airflow with a louvred door or a small exhaust fan, keep humidity down with a dehumidifier in the adjoining space if it is damp, and keep it away from water heaters and bathrooms. Check each device's operating range on its spec sheet. During renovation, have the equipment shut down and covered or moved before dusty work starts.
The bottom line
An older St. Louis building can make a fine dental office, provided the walls, the basement and the panel are understood before the lease is signed rather than after the first operatory goes dark. Fill in the survey sheet, photograph everything, and put the server above the water line. If you would like the sheet, the photos and your floor plan reviewed before you commit, you are welcome to request a Free Dental IT Assessment, whether the building is in South City, Webster Groves, Kirkwood or Belleville.