Adding Operatories to an Existing Dental Office: The IT Checklist

The contractor has a start date, the two new chairs are on order, and the hygienist who will work in room 7 starts in March. Patients will still be in rooms 1 to 6 the whole time. Somewhere in that plan sits a question nobody has answered yet: what has to happen on the computer side before anyone sits in the new chairs?

This checklist is for the owner or office manager of an established practice adding one to three chairs inside the same suite or into a neighbouring unit. It covers the whole IT side, from the day the floor plan is final to the first week after the new rooms open. If you are opening a separate second office, the de novo office technology plan is the better guide. If you are moving the whole practice, use the relocation IT checklist.

In this guide
  1. The add-a-chair IT checklist at a glance
  2. What changes in your IT when you add two or three chairs?
  3. When should IT enter the renovation schedule?
  4. What goes into each new operatory?
  5. Do new chairs need more software licences?
  6. Will your server handle the extra workstations? A worked example
  7. How do you make new rooms take x-rays like the old ones?
  8. How do you keep seeing patients while the contractor works?
  9. What does the network side need to cover?
  10. Phones, screens and the front desk: what else do new chairs touch?
  11. How should you budget the IT side of adding chairs?
  12. What should you test before the first patient sits in a new chair?
  13. What changes in your monthly IT after the rooms open?
  14. What to ask your IT provider before the contractor starts
  15. Where has Legend done this kind of work?
  16. Frequently asked questions
  17. The bottom line

The add-a-chair IT checklist at a glance

The table below is the whole project on one page. Each row is a job that must be finished by a point in the renovation, with the person who usually owns it. Print it, put a name in the last column and use it in your first meeting with the contractor and your IT provider.

JobFinish byUsually owned byName on your project
Share the final floor plan and equipment list with ITBefore the contractor's pricing is finalOwner or office manager
Decide what each new chair holds (monitors, sensor, camera, scanner dock, phone, TV)Before the electrical and data plan is drawnDoctor, with the equipment dealer
Check software and imaging licences for the new workstationsBefore hardware is orderedOffice manager, with each vendor
Check the server against the new workstation countBefore hardware is orderedIT provider
Order workstations, monitors and any network gearEarly enough to configure before install weekIT provider or office manager
Pull, label and test data runsBefore the walls and ceiling closeLow-voltage contractor, with IT's drop list
Protect the existing rooms and network closet during constructionFrom day one of demolitionIT provider and general contractor
Configure workstations, imaging, printers and phonesInstall week, after paint and dustIT provider and imaging vendor
Run the first-patient acceptance test in every new chairThe working day before the first patientIT provider, with a clinical team member
Update backups, monitoring, the device list and support recordsWithin the first weekIT provider

Every row in this table gets its own section below. Two of them, the server check and the acceptance test, are where most add-on projects go wrong, so they get the most space.

What changes in your IT when you add two or three chairs?

More chairs change eight systems at once: the number of workstations, the licences that let them run your software, the server that holds the database, the imaging setup in each room, the phones, the network, the backups and the records your IT provider keeps. A project that plans only the cabling leaves seven of the eight to chance.

It helps to see the eight side by side, because each one has a different owner and a different deadline:

    1. Workstations. Each chair usually adds one computer, and often two monitors (one for the clinician, one for the patient). A consult room or a second hygiene coordinator desk adds more.
    1. Licences. Practice management software, imaging software, Microsoft Windows and Microsoft 365, antivirus and remote-support tools are each licensed in their own way. Some count workstations, some count users, some count providers or locations.
    1. The server. More workstations means more connections to the practice database and more images written to storage. Vendor requirements change at set workstation counts, covered in the worked example below.
    1. Imaging. The new room's sensor, intraoral camera and any scanner dock need the same drivers, software versions and bridge settings as the rooms that already work.
    1. Phones. A new extension, a place on the paging and intercom plan, and power for the handset.
    1. Network. Data runs, switch ports, power over Ethernet for phones and access points, and Wi-Fi coverage in the new area.
    1. Backups. Anything new that stores data, such as an imaging acquisition PC, must be inside the backup scope.
    1. Records and support. The device list, the network diagram, the monitoring console, warranty dates and the support agreement's device count.

Most offices handle numbers 1 and 6 because the contractor and the equipment dealer raise them. Numbers 2, 3, 7 and 8 rarely come up unless someone asks, and they are the ones that cause trouble in the first month.

When should IT enter the renovation schedule?

IT should see the plan before the contractor's price is final, ideally 12 or more weeks before the first patient sits in a new chair. At that point every decision is still cheap: data runs can move on paper, the server can be checked and licences can be quoted. Each week later narrows the options.

The timeline below counts back from the first patient in the new chair. Treat the week numbers as a planning guide. A small project can compress it, and a project that adds a CBCT room or moves the front desk will stretch it.

WhenWhat happens on the IT sideWhat you hand over or decide
12+ weeks beforeIT reviews the floor plan, the equipment list and the current setupThe floor plan, the dealer's equipment quote, your practice software and imaging names and versions
10 weeks beforeIT checks the server against the new workstation count and lists licence questions for each vendorWhich rooms get which devices; any plan to add a scanner or CBCT later
8 weeks beforeQuotes for workstations, monitors, licences and any network gear; a drop list for the low-voltage contractorApproval of the quotes and the drop list
Walls openData runs pulled and labelled in the new rooms; a check that existing runs and the internet line are protectedAccess to the suite for the low-voltage contractor and IT
Before the ceiling closesEvery new run tested, with results kept; access point positions confirmedA short site walk with IT and the contractor
2 weeks beforeWorkstations imaged, joined to the practice network and loaded with practice and imaging software, ready to installStaff logins for anyone who will work in the new rooms
Install weekWorkstations, monitors, phones and imaging devices installed after paint and the worst of the dustA quiet window, usually after hours, for any server or switch change
1 working day beforeThe first-patient acceptance test in every new chairA clinical team member for an hour
First 2 weeksBackups, monitoring and records updated; follow-up on anything the team reportsFeedback from the people using the new rooms

The 8-week point is when most surprises surface. A practice that learns at that stage that its server needs replacing still has time to plan it. A practice that learns it during install week ends up running new chairs on a server that was already at its limit.

If you would like the build side of a project like this planned with you from the first floor-plan review, you can talk through an in-place expansion with Legend's build-out team. The conversation starts with the floor plan and your equipment list.

What goes into each new operatory?

A typical new chair needs a workstation, one or two monitors, a sensor or a way to share one, an intraoral camera, a phone, and often a patient-facing screen. Each item has a supplier, an installer and sometimes a licence, and those three are often different people. Writing them down per chair is the easiest way to find the gaps.

Use this sheet once for each new chair. The "who supplies" and "who installs" columns describe common practice; your dealer and IT agreements decide.

ItemWho usually supplies itWho usually installs or configures itLicence or setting to check
Operatory workstationIT provider or office managerIT providerWindows edition, practice software workstation install, imaging software, antivirus and remote-support agent
Clinician monitorIT providerIT providerMounting position agreed with the dealer before the delivery unit is installed
Patient-facing monitor or TVIT provider or audio-video installerIT provider or installerHow it is driven: from the workstation, or as a separate networked screen
Intraoral sensorEquipment dealerDealer or imaging vendor, with IT for driversSame model and driver version as existing rooms, or a documented reason for a different one
Intraoral cameraEquipment dealerDealer, with IT for driversCapture settings in the imaging software for the new workstation
Scanner dock or cart positionScanner vendorVendor, with IT for network accessWhere scans upload, and whether the new room needs a run for the scanner's PC
Desk or wall phonePhone providerPhone provider or IT providerNew extension, paging group, power from the switch
Signature pad or patient tabletPractice software vendor or IT providerIT providerDriver support in your practice software version
Footswitch, chairside keyboard and mouseIT providerIT providerCleanable keyboard and cable routing that keeps clear of the chair base
Network runsLow-voltage contractorContractor pulls, IT connectsCount per room from the device list, plus a spare

Two choices on this sheet save money and trouble later. First, buy the new workstations to the same specification as your current operatory PCs, or better, so one setup image and one driver set cover every room. The guide on which computers to buy for a dental office covers how to set that specification. Second, keep sensors and cameras on the same model your other rooms use where you can. Mixed sensor models mean mixed drivers, and that doubles the testing every time Windows or the imaging software updates.

If the new chairs will use a different sensor, read the guide to choosing dental x-ray sensors and setting them up before the order goes in.

Do new chairs need more software licences?

Often they do, though which ones depends on how each vendor counts. Practice management software may be licensed per workstation, per provider or per location. Imaging software may count acquisition stations separately from viewing stations. Windows comes with each new PC, but Microsoft 365 and security tools count users or devices. Ask each vendor before the hardware is ordered.

Licensing surprises are cheap to avoid and expensive to discover on opening day, when a new workstation installs the practice software and then refuses to open a chart. The questions below are worth sending to each vendor in writing, so the answer sits in your files:

    • Practice management software. "We are adding [number] workstations and [number] new provider or hygienist schedules. Does our agreement cover them, or do we need more licences or a change to our plan?"
    • Imaging software. "We are adding [number] operatories with sensors and cameras. Do we need more acquisition licences, and can each new workstation also view images taken in other rooms?"
    • Imaging bridge. "Does the bridge between our practice software and our imaging software need anything set on each new workstation?"
    • Patient communication, forms and payment tools. "Do any of your products count workstations or devices, and do new rooms change our bill?"
    • Microsoft 365 and email. New chairs usually add no new users. A new hygienist or assistant does, and should get their own account rather than sharing one, set up before their first day.
    • Security and remote-support tools. Your IT provider counts these per device. New PCs change the count and, under most support agreements, the monthly bill.

Keep the vendor answers with the project file. If a vendor says a licence is included, ask for that in an email; a phone answer is hard to find a year later.

Will your server handle the extra workstations? A worked example

It depends on where your workstation count lands. Dentrix and Open Dental both publish server guidance that changes once an office passes ten workstations, and Open Dental's guidance on Windows 11 Professional sets a second ceiling near 16 workstations. Count every computer that will run the practice software after the project, then compare it with the vendor's own numbers.

Here is what the vendors publish, as of November 2026:

    • Henry Schein One's Dentrix G7.9 System Requirements (publication date July 2022) list server memory as "8 GB RAM (if ≤ 10 workstations); 16 GB RAM (if >10 workstations)". The same document says client versions of Windows can act as the database server, but "operating system connection limits should be evaluated when selecting an operating system for the Dentrix database server".
    • Open Dental's Hardware Requirements (last updated August 2026) group database servers by workstation count: "1 to 10" workstations on Windows 11 Professional, and "11 to 30" on Windows 11 Professional or Windows Server. The document states that "Windows 11 Professional allows up to 20 concurrent connections" and recommends "allowing 20 – 25 % more connections than workstations".

Now apply those numbers to two example offices.

Office A: from nine computers to twelve

Office A has six operatories, two front desk PCs and the doctor's office PC: nine workstations. It adds three operatories, one computer each, so it ends at twelve.

CheckBefore (9 workstations)After (12 workstations)What it means
Dentrix server memory guidance8 GB tier (10 or fewer)16 GB tier (more than 10)A Dentrix server with 8 GB needs a memory upgrade, or replacing if it cannot take one
Open Dental server tier"1 to 10""11 to 30"Windows 11 Professional is still listed, and Windows Server becomes an option
Connections needed at 20 to 25% headroom10.8 to 11.2514.4 to 15Under Windows 11 Professional's 20, so no operating system change is forced yet

For Office A the project needs a memory check on a Dentrix server and no server replacement. That is a small purchase, if someone spots it at week 10. It becomes a rushed one if the new rooms open on an 8 GB server and the front desk starts reporting slow charts.

Office B: from fourteen computers to seventeen

Office B is larger: eight operatories, three front desk PCs, and one PC each in the doctor's office, the consult room and the business office. That is fourteen workstations. It adds three operatories and ends at seventeen.

CheckBefore (14 workstations)After (17 workstations)What it means
Connections needed at 20 to 25% headroom16.8 to 17.520.4 to 21.25Over Windows 11 Professional's 20 concurrent connections
Open Dental server tier"11 to 30""11 to 30"Same tier; the operating system is now the limit
Dentrix server memory guidance16 GB tier16 GB tierNo change in memory guidance; the connection limit still needs evaluating

Office B's three new chairs push the database server past the ceiling of the Windows edition it runs on. If the server is a Windows 11 Professional PC, the practice should plan a move to Windows Server as part of the project. That is a bigger job than a memory upgrade. It touches backups, the imaging share and every workstation's connection, and it belongs in a planned after-hours window with the vendor's support line informed.

Two details change the arithmetic for your office. First, count every computer that opens the practice software, including the doctor's laptop and any computer in the lab or sterilization area. Second, some offices put imaging on the same server and some on a separate one. Open Dental's table, for example, says the images folder "Typically, yes" shares the database server at 11 to 30 workstations and "Maybe" at 31 to 100. More chairs mean more images, so check free storage at the same time. Software editions and the Windows versions they support also change over time, so check the vendor's current page against the current system requirements for Dentrix, Eaglesoft and Open Dental before buying anything.

If the count puts you near a limit, your IT provider can also weigh whether this is the moment to rethink the server altogether, including whether a replacement or a move to cloud-hosted software fits the next five years better.

How do you make new rooms take x-rays like the old ones?

Set the new rooms up to match a room that already works. Same sensor model and driver, same imaging software version, same bridge settings from the practice software, and the same capture and export settings. Then prove it with a test image on a test patient, viewed from a different workstation, before a real patient sits down.

Imaging is where a new chair most often fails on its first day, because it depends on four parts lining up: the device, its driver, the imaging software on the new workstation and the bridge that opens the right patient from the practice software. A gap in any one of them looks the same to the clinician: the sensor does nothing, or the image lands in the wrong chart.

A short imaging setup list for each new room:

    • Copy a known-good room. Write down the sensor model, driver version, imaging software version and bridge settings in an existing operatory, and set the new workstation to match.
    • Name the workstation clearly. Most imaging and practice systems record which computer took an image. "OP7" is easier to trace than a factory name.
    • Check the image path. The new workstation should save to the same shared image location as every other room, never to its own local drive.
    • Test capture and viewing. Take a test image on a test patient in the new room, then open it from the front desk and from another operatory.
    • Test the camera separately. An intraoral camera uses its own capture path; test it on the same test patient.

If the project also adds a scanner or a CBCT room, those have their own computer and network needs. The guide to CBCT computer and network requirements covers the larger of the two, and an intraoral scanner needs a check of where its scans upload. When something does not connect, the imaging integration troubleshooting guide walks through the bridge between practice software and imaging.

How do you keep seeing patients while the contractor works?

Treat the construction area and the working office as two zones. Protect the network closet and existing cabling from dust and accidental cuts, schedule any power shutdown or server and switch change after hours, give contractors guest Wi-Fi only, and check the office each morning before the first patient. Most disruption comes from small things nobody planned for.

An occupied office has risks a new build does not. The building is live, patients are in the next room, and the contractor's priority is the new space. This checklist covers the weeks of construction:

WhenCheckWhy
Before demolitionMark where existing data runs, the internet line and phone lines pass through the work areaCutting a live run in a wall can take down a room or the whole front desk
Before demolitionAgree with the contractor who may enter the network closet, and keep it closedDust and accidental unplugging are the closet's two main risks during building work
Before demolitionCover or move any computer or printer near the work areaDrywall and cutting dust gets into fans and power supplies
Before any power workAsk the electrician to schedule shutdowns outside clinic hours and tell IT the timeAn unplanned power cut can stop the server mid-write; IT can shut it down cleanly first
Each power shutdownConfirm the server and network came back, and that the morning backup ranA server that does not restart is found at 7:30 a.m., not 10 p.m.
During constructionGive contractors the guest Wi-Fi, never the clinical network passwordContractors need internet for their tools and should not need access to practice systems
During constructionKeep a working spare: one computer that can stand in if a room loses its PCA covered or damaged workstation should not cancel a chair
Each morningBefore the first patient, log in at the front desk and one operatory, and open today's scheduleA five-minute check finds overnight problems before patients arrive
Before install weekHave the construction area cleaned before workstations are unboxedNew computers installed into dust start their life with clogged fans

If you need to shut the whole server down for an electrical job, the safe shutdown steps and restart mistakes are worth giving to whoever will be in the office that night.

What does the network side need to cover?

The network side starts from a device list for each new room, taken from the per-chair sheet above. From that list your IT provider and the low-voltage contractor set the drop count, confirm switch ports and power over Ethernet for the new phones and access points, and check that Wi-Fi reaches the new rooms. All of it is settled before the walls close.

This checklist leaves the cabling method to the guides that own it. The guide to dental office network setup explains drops, closets, switching and Wi-Fi in full, including how cabling works when a renovation runs around patients. For a room-by-room view, see a cabling walkthrough for adding rooms to an occupied office in Dallas; its tables apply well outside Texas.

The owner's part is short. Hand over the device list per room at the 8-week point, ask for the answer on switch ports and power in writing so any new switch goes into the budget now rather than in install week, and file the cable test results with the project papers. If the new rooms mean the old network design no longer fits, you are welcome to ask for a review of your network design before the walls close.

Phones, screens and the front desk: what else do new chairs touch?

New chairs reach beyond the rooms themselves. Each one usually adds a phone extension, a place on the intercom or paging plan, and a column on the schedule the front desk manages. Patient-facing screens add their own power and mounting decisions. Plan all of these with the chairs, so the front desk is ready on the day the rooms open.

A few items that often get missed:

    • Phone extension and paging. Decide the new rooms' extension numbers, add them to the paging group and update the printed extension list at the front desk. If your phones pop the patient record on an incoming call, check that the new handset is included in that integration.
    • Schedule columns. New chairs add operatory or provider columns in the practice software. Setting them up is a front office task, and it is easier with the IT side done first so the column has a working room behind it.
    • Front desk printing and forms. More chairs mean more walkouts, statements and labels at the front desk. Check that the printer and any label printer cope with the extra volume.
    • Patient-facing screens. A screen mounted on the wall or the ceiling needs power at the right height and backing in the wall, decided while the walls are open. Decide whether it shows the workstation's screen or runs as a separate networked TV.
    • The front desk itself. If the project also moves the front desk, treat that as its own small move: every computer, printer, card terminal and phone at the desk changes location on the same day.

How should you budget the IT side of adding chairs?

Budget by line item per chair, plus the shared items the project triggers: a server upgrade, a switch, more licences and the project labour. Under Legend's published terms, "Hardware procurement, major cabling projects and software licensing are quoted separately" from a monthly support plan, so expect a project quote alongside your normal invoice.

This sheet uses counts. Fill in your own quotes beside each line. It is laid out for Office A from the worked example: three new chairs, nine computers growing to twelve.

LinePer chairFor 3 chairsShared items this project may addYour quote
Workstation13
Monitors1 to 23 to 6
Data runs, including a sparefrom the device listfrom the device listA second patch panel if the closet is full
Phone handset and extension13A switch with more power over Ethernet if the budget is used up
Sensor and cameraper dealer quoteper dealer quote
Practice software licence changesper vendor answerper vendor answer
Imaging software licence changesper vendor answerper vendor answer
Server changeMemory upgrade (Office A, Dentrix); new server or Windows Server (Office B)
Security and remote-support tools1 device3 devicesChange in the monthly device count
Project labourConfiguration, install week, acceptance test, records update

Two habits keep the budget honest. Ask your IT provider and the equipment dealer whether either quote assumes the other is supplying something, such as the monitors or the sensor drivers. And ask every vendor whether the new chairs change any monthly fee, because the purchase price is only part of what new rooms cost over the following years.

If the expansion is one step in a longer plan, put it on the practice's yearly IT plan so the server, the network and the replacement dates for older rooms are planned together.

What should you test before the first patient sits in a new chair?

Run a short acceptance test in every new chair on the working day before it opens, with a clinical team member doing what they will do with a real patient: log in, open the schedule and a test patient, take an image, make a call and print. If a step fails, it gets fixed before the chair is booked.

Plan about an hour for three rooms. Tick each one per chair.

#TestPass looks like
1The assigned staff member logs in with their own accountTheir desktop loads; no shared login
2Open the practice software and today's scheduleThe new room's column shows, with the right provider
3Open a test patient's chartThe chart opens in a few seconds, as it does in other rooms
4Launch imaging from the chartThe imaging software opens on the same test patient
5Take a sensor image on the test patientThe image lands in the test patient's record
6Capture an intraoral camera imageIt saves to the same record
7Open both images from the front desk and from another operatoryThey appear without delay
8Show the image on the patient-facing screenThe screen displays what the clinician chooses
9Make and receive a call on the room's phone; test pagingCalls connect; the room is in the paging group
10Print a treatment plan or a label to the usual printerIt prints where the team expects
11Confirm the workstation appears in monitoring and the backup scopeIT confirms both, by name
12Record the workstation on the device listName, room, serial number, purchase date and warranty end

After the test, delete or archive the test patient's images so they do not confuse anyone later. Note who ran the test and the date on the project file.

What changes in your monthly IT after the rooms open?

Your IT records and support should grow with the office. The new workstations belong in patching, monitoring, backup checks and the device list, and your support agreement's device count will usually change. Give it two weeks, then ask your IT provider to confirm each of those in writing, so nothing new sits outside the normal routine.

The first fortnight is also when small problems appear: a sensor that disconnects at lunch, a phone that drops off the paging group, a printer that the new room cannot see. Ask the team to report them as they happen rather than saving them for a meeting.

Within a month, check that:

    • every new workstation receives the same updates on the same schedule as the existing rooms;
    • the nightly backup and the last restore test include anything new that stores data;
    • the network diagram and closet labels show the new runs and ports;
    • the device list has warranty end dates for the new hardware, so it enters the replacement plan;
    • the support agreement lists the new devices, and you understand any change to the monthly bill.

Keep the per-chair sheet, the vendor licence answers, the cable test results and the acceptance test with the device list. The next expansion, or the next IT provider, will need them.

If you would like one team to look after the whole office once the new rooms are in, ongoing dental IT support covers the monitoring, updates and helpdesk side, with the new chairs included from their first day.

What to ask your IT provider before the contractor starts

These questions turn the checklist into a conversation. Ask them at the first floor-plan meeting, and expect clear, specific answers. If you are still choosing who will look after the project, the list of best dental IT companies is a starting point for comparing providers.

  1. Have you seen our final floor plan and the dealer's equipment list?
  2. How many computers will run our practice software after the project, and does our server's memory, storage and Windows edition cover that number?
  3. Which licences change for practice software, imaging, Microsoft 365 and your own tools, and will you ask the vendors or should we?
  4. What is the drop list for each new room, and who gives it to the low-voltage contractor?
  5. Do our switches have free ports and enough power over Ethernet for the new phones and access points?
  6. How will you protect the network closet and existing cabling during construction?
  7. When will the workstations be configured, and when will they be installed?
  8. Which changes need an after-hours window, and who will be in the office for it?
  9. Who runs the first-patient acceptance test, and what does it cover?
  10. When will the new devices appear in monitoring, backups, the device list and our agreement, and what changes on the monthly bill?

Where has Legend done this kind of work?

Legend works on practices that are already running as well as on new offices. One project page covers an oral surgery practice's expansion to a new location, where Legend's team installed workstations, networking and Wi-Fi, backups, phone integration, treatment-room technology and imaging stations. Another covers a technology upgrade in an established practice, spanning computers, server infrastructure, networking, software and security.

Background on the team that wrote this checklist:

    • Based in Dallas, with 22+ years in dental IT (since 2004); served over 3,500 practices since 2004
    • Practice software supported: Dentrix, Eaglesoft, Open Dental, Archy; imaging systems: DEXIS, Vatech, Carestream, Planmeca/Romexis, Dolphin Imaging
    • 24/7 monitoring
    • In-house engineers; no outsourced first-level triage
    • Onsite dispatch by appointment across served dental markets; remote-first nationwide
    • 4.8 rating · 173 Google reviews

Written by Ian Lynch (22 years in dental IT; oversees the NOC, onsite dispatch and client technology roadmaps). A first question about your project can go to the helpdesk staffed 24/7 at 1-800-794-1588. Practices looking for help in a particular area can also see where Legend supports dental offices.

Questions

Frequently asked questions

Do new operatories need their own practice software licence?

It depends on how your practice software is licensed. Some agreements count workstations, some count providers or hygiene schedules, and some count locations. Write to the vendor with the number of new workstations and new schedules before you order hardware, and keep the written answer. Imaging software can have separate acquisition licences, so ask that vendor the same question.

Can we move an older computer into a new operatory to save money?

You can, if it meets your practice and imaging software's current requirements and still receives Windows updates. An older machine is often the slowest in the office within a year and the first to fail a sensor driver update. Many practices buy the new operatory PCs new and move older machines to low-demand jobs, or retire them.

Should new operatories use the same sensor model as our existing rooms?

Where you can, yes. One sensor model means one driver set, one set of capture settings and one round of testing when Windows or the imaging software updates. If the new rooms need a different model, record it on the device list and test both models after every imaging or Windows update, since each driver can behave differently.

Can we keep seeing patients while new operatories are built?

Most practices do. Keep the construction area and the working office apart, protect the network closet from dust and accidental unplugging, and schedule power shutdowns and server work after hours. A five-minute check each morning, logging in at the front desk and one operatory, catches overnight problems before the first patient arrives.

Will adding chairs slow down our practice software?

It can, when the server is near a limit. More workstations mean more connections to the database and more images on storage. Dentrix's published server memory guidance changes above ten workstations, and Open Dental cites a 20-connection limit for Windows 11 Professional. Count your workstations after the project and check the server before the new rooms open.

What should we test before the first patient sits in a new chair?

Test what the team will do with a real patient. Log in with the staff member's own account, open the schedule and a test patient, launch imaging, take a sensor and a camera image, view them from another room, make a call and print. Confirm the workstation is in monitoring and the backup scope, then add it to the device list.

Do new operatories change our backup?

They can. Operatory workstations usually save images to a shared location that is already backed up. An acquisition PC for a scanner or CBCT, or any computer that stores data locally, needs adding to the backup scope. Ask your IT provider to confirm by name which new devices are covered, and to include them in the next restore test.

Who should order the computers for new operatories, the equipment dealer or the IT provider?

Either can, as long as one party owns the specification. The computers must meet your practice and imaging software requirements, match your existing rooms where possible, and be configured before install week. Ask both the dealer and the IT provider whether their quote includes workstations or monitors, so you do not pay twice or receive none.

Should the new rooms join our support plan right away?

Yes. New workstations should receive updates, monitoring and backup checks from their first day, the same as the existing rooms. Most support agreements count devices, so your monthly bill may change. Ask your IT provider to confirm in writing when the new devices were added and what changed in the agreement.

When should the computers for new operatories be set up?

Have them configured about two weeks before opening: imaged, joined to the practice network and loaded with practice and imaging software. Install them after paint and the worst of the dust, then run the acceptance test the working day before the first patient. Unboxing new PCs into a dusty room shortens their life.

The bottom line

If you have a floor plan and a start date, the most useful next step is a Free Dental IT Assessment. It reviews your computers, software, network security, backups and performance, and its written findings show whether your server, licences and network are ready for more chairs. From there, dental IT support keeps the new rooms looked after with the rest of the office.

Ian Lynch
About the author

Ian Lynch

Owner & Operator, Legend Networking

22 years in dental IT. Oversees the NOC, onsite dispatch and client technology roadmaps for practices nationwide.

  • Operations center

    Dallas, Texas

    Serving dental practices nationwide since 2004

  • NOC hours

    24/7 monitoring

    Helpdesk staffed 24/7 at 1-800-794-1588

  • Engineers

    In-house only

    No outsourced first-level dental IT triage

  • Onsite dispatch

    By appointment

    Technicians deployed across served dental markets

About Legend Networking
Your next step

Plan the IT side before the contractor's price is final

Tell us what you are running and we will review it with you.